Model Formulation to Estimate Manpower Demand for the Real-Estate Construction Projects in India

نویسندگان

  • B. L. Rajput
  • Anil L. Agarwal
چکیده

Real Estate as well as Infrastructure constructions are a part of the development and indicators of the growth of the economy. At any point of time huge amount of construction is carried out across pan India, with natural cycle of ups and downs in the quantum of work executed per annum. Construction requires large number of manpower in the categories of un-skilled, skilled and technical for planning, monitoring and execution of these projects. Manpower demand estimation is an essential component to facilitate manpower deployment. The construction output and manpower constants are found to be the most significant and sensitive factors determining the demand of construction manpower. In this paper efforts are made to formulate the model to assist in predicting manpower demand for effective deployment of the construction manpower from the contractor perspective. Keywords

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

OPTIMIZATION OF MULTI PERIOD - MULTI LOCATION CONSTRUCTION PROJECTS CONSIDERING RESOURCE POOL AND BATCH ORDERING

During the past two decades, some industries have been moving towards project-centered systems in many modern countries. Therefore, managing simultaneous projects with considering the limitations in resources, equipment and manpower is very crucial. In the real world, project-based organizations are always facing with two main important features. First, the construction projects are decentraliz...

متن کامل

An Empirical Analysis of China’s International Reserves Demand Function

The study aims to estimate an international reserves demand model for China using economic growth, propensity to import, real effective exchange rate and trade openness variables for quarterly period spanning from 1985Q1 to 2014Q4.The bounds testing technique to cointegration is used to test for a long run relationship, while the autoregressive distributed lag approach is used to estimate short...

متن کامل

Elimination of Waste and Inefficient Facilities in Existing Buildings for Sustainability in Developing Nations

A major reason why many developing nations have not made significant advancement in sustainable development (SD) agenda is the neglect of existing building stock which forms the bulk of built assets. Although sustainable development is a universal challenge, it cannot be approached in the same way for all nations, but rather practical response can be defined nationally or locally. This paper re...

متن کامل

A Neural Network Model Based on Support Vector Machine for Conceptual Cost Estimation in Construction Projects

Estimation of the conceptual costs in construction projects can be regarded as an important issue in feasibility studies. This estimation has a major impact on the success of construction projects. Indeed, this estimation supports the required information that can be employed in cost management and budgeting of these projects. The purpose of this paper is to introduce an intelligent model to im...

متن کامل

Systemic Stakeholders’ Management for Real Estate Development Projects

Purpose: This paper aims to investigate the stakeholder management system, within the real estate industry, and in light of the theories on negotiations and decision-making processes. Design/Methodology/Approach: This article critically reviews research from real estate and management literatures to systematize what we already know about stakeholder management within real estate development pro...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013