A new robust optimization approach for scheduling under uncertainty: : I. Bounded uncertainty
نویسندگان
چکیده
The problem of scheduling under bounded uncertainty is addressed. We propose a novel robust optimization methodology, which when applied to mixed-integer linear programming (MILP) problems produces “robust” solutions which are in a sense immune against bounded uncertainty. Both the coefficients in the objective function, the left-hand-side parameters and the right-hand-side parameters of the inequalities are considered. Robust optimization techniques are developed for two types of uncertain data: bounded uncertainty and bounded and symmetric uncertainty. By introducing a small number of auxiliary variables and constraints, a deterministic robust counterpart problem is formulated to determine the optimal solution given the (relative) magnitude of uncertain data, feasibility tolerance, and “reliability level” when a probabilistic measurement is applied. The robust optimization approach is then applied to the scheduling under uncertainty problem. Based on a novel and effective continuous-time short-term scheduling model proposed by Floudas and coworkers [Ind. Eng. Chem. Res. 37 (1998a) 4341; Ind. Eng. Chem. Res. 37 (1998b) 4360; Ind. Eng. Chem. Res. 38 (1999) 3446; Comp. Chem. Engng. 25 (2001) 665; Ind. Eng. Chem. Res. 41 (2002) 3884; Ind. Eng. Chem. Res. (2003)], three of the most common sources of bounded uncertainty in scheduling problems are addressed, namely processing times of tasks, market demands for products, and prices of products and raw materials. Computational results on several small examples and an industrial case study are presented to demonstrate the effectiveness of the proposed approach. © 2003 Elsevier Ltd. All rights reserved.
منابع مشابه
ROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS II. SOUNDS OF SILENCE: A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA HARMONY SEARCH METAHEURISTIC
In this paper, we present a new idea for robust project scheduling combined with a cost-oriented uncertainty investigation. The result of the new approach is a makespan minimal robust proactive schedule, which is immune against the uncertainties in the activity durations and which can be evaluated from a cost-oriented point of view on the set of the uncertain-but-bounded duration and cost param...
متن کاملRobust production scheduling in open-pit mining under uncertainty: a box counterpart approach
Open-Pit Production Scheduling (OPPS) problem focuses on determining a block sequencing and scheduling to maximize Net Present Value (NPV) of the venture under constraints. The scheduling model is critically sensitive to the economic value volatility of block, block weight, and operational capacity. In order to deal with the OPPS uncertainties, various approaches can be recommended. Robust opti...
متن کاملDeveloping Robust Project Scheduling Methods for Uncertain Parameters
A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...
متن کاملScheduling Post-Distribution Cross-Dock under Demand Uncertainty
The system of distribution of goods and services, along with other economic developments around the world, is rapidly evolving. In the world of distribution of goods, the main focus is on making distribution operations more effective. Due to the fact that the cross-dock has the advantage of removing intermediaries and reducing the space required for the warehouse, it is worth considering. Among...
متن کاملRobustness-based portfolio optimization under epistemic uncertainty
In this paper, we propose formulations and algorithms for robust portfolio optimization under both aleatory uncertainty (i.e., natural variability) and epistemic uncertainty (i.e., imprecise probabilistic information) arising from interval data. Epistemic uncertainty is represented using two approaches: (1) moment bounding approach and (2) likelihood-based approach. This paper first proposes a ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Computers & Chemical Engineering
دوره 28 شماره
صفحات -
تاریخ انتشار 2004