Job Shop Scheduling with Setup Times and Maximal Time-Lags: A Simple Constraint Programming Approach
نویسندگان
چکیده
In previous work we introduced a simple constraint model that combined generic AI strategies and techniques (weighted degree heuristic, geometric restarts, nogood learning from restarts) with naive propagation for job shop and open shop scheduling problems. Here, we extend our model to handle two variants of the job shop scheduling problem: job shop problems with setup times; and job shop problems with maximal time lags. We also make some important additions to our original model, including a solution guidance component for search. We show empirically that our new models often outperform the state of the art techniques on a number of known benchmarks for these two variants, finding a number of new best solutions and proving optimality for the first time on some problems. We provide some insight into the performance of our approach through analysis of the constraint weighting procedure.
منابع مشابه
A fuzzy multi-objective linear programming approach for solving a new multi-objective job shop scheduling with sequence-dependent setup times
This paper presents a new mathematical model for a bi-objective job shop scheduling problem with sequence-dependent setup times that minimizes the weighted mean completion time and the weighted mean tardiness time. For solving this multi-objective model, we develop a fuzzy multi-objective linear programming (FMOLP) model. In this problem, a proposed FMOLP method is applied with respect to the o...
متن کاملMinimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times
The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...
متن کاملA Job Shop Scheduling Problem with Sequence-Dependent Setup Times Considering Position-Based Learning Effects and Availability Constraints
Sequence dependent set-up times scheduling problems (SDSTs), availability constraint and transportation times are interesting and important issues in production management, which are often addressed separately. In this paper, the SDSTs job shop scheduling problem with position-based learning effects, job-dependent transportation times and multiple preventive maintenance activities is studied. ...
متن کاملA New Multi-objective Job Shop Scheduling with Setup Times Using a Hybrid Genetic Algorithm
This paper presents a new multi objective job shop scheduling with sequence-dependent setup times. The objectives are to minimize the makespan and sum of the earliness and tardiness of jobs in a time window. A mixed integer programming model is developed for the given problem that belongs to NP-hard class. In this case, traditional approaches cannot reach to an optimal solution in a reasonable...
متن کاملVirtual manufacturing cells scheduling considering lotstreaming and sequence dependent setup times
In this paper, a new mathematical model for the problem of job scheduling in virtual manufacturing cells (VMC) is presented to minimizing the completion time of all jobs. Sequence dependent setup times of machines is considered and lot-streaming is possible. In Virtual manufacturing cells, each job has a different processing path and there is a set of machines for processing each operation. The...
متن کامل