Scheduling with uncertain durations: generating β-robust schedules using constraint programming
نویسندگان
چکیده
Many real-world scheduling problems are subject to change, and scheduling solutions should be robust to those changes. We consider a single-machine scheduling problem where the processing time of each activity is characterized by a normally-distributed random variable, and we attempt to minimize flowtime. We develop an initial constraint model for generating the β-robust schedule the schedule that has highest probability of producing a flowtime less than a stated bound. Experiments with this initial model show that a constraint-based approach is feasible, but that better propagation methods will be required.
منابع مشابه
ROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS II. SOUNDS OF SILENCE: A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA HARMONY SEARCH METAHEURISTIC
In this paper, we present a new idea for robust project scheduling combined with a cost-oriented uncertainty investigation. The result of the new approach is a makespan minimal robust proactive schedule, which is immune against the uncertainties in the activity durations and which can be evaluated from a cost-oriented point of view on the set of the uncertain-but-bounded duration and cost param...
متن کاملROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS I. A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA APPROACH
This paper, we presents a new primary-secondary-criteria scheduling model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations (UD) and cash flows (UC). The RCPSP-UD-UC approach producing a “robust” resource-feasible schedule immunized against uncertainties in the activity durations and which is on the sampling-based scenarios may be evaluated from a cos...
متن کاملA New Approach Generating Robust and Stable Schedules in m-Machine Flow Shop Scheduling Problems: A Case Study
This paper considers a scheduling problem with uncertain processing times and machine breakdowns in industriall/office workplaces and solves it via a novel robust optimization method. In the traditional robust optimization, the solution robustness is maintained only for a specific set of scenarios, which may worsen the situation for new scenarios. Thus, a two-stage predictive algorithm is prop...
متن کاملDeveloping Robust Project Scheduling Methods for Uncertain Parameters
A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...
متن کاملβ-Robust Solutions for the Fuzzy Open Shop Scheduling
We consider the open shop scheduling problem with uncertain durations modelled as fuzzy numbers. We define the concepts of necessary and possible β-robustness of schedules and set as our goal to maximise them. Additionally, we propose to assess solution robustness by means of Monte Carlo simulations. Experimental results using a genetic algorithm illustrate the proposals.