Empirical validation of Software development effort multipliers of Intermediate COCOMO Model

نویسندگان

  • M. J. Basavaraj
  • K. C. Shet
چکیده

Intermediate COCOMO Model computes effort as a function of program size and a set of cost drivers. Effort adjustment factor (EAF) is calculated using 15 cost drivers. EAF is an important significant factor in computing software development effort. We have taken one delivered development project of size of 479 function points and planned for 917 Person days of SEI CMM Level 5 “Excellent” Company as a case study to analyze the EAF. We have empirically validated the cost driver model for Intermediate COCOMMO using this projects data. Validation has been done by using other two development projects data of Excellent Company. From our analysis, we have found that cost drivers defined ratings need to be revisited for the projects of size less than 10 Person months. We have come out with ratings for some cost drivers where earlier it was not defined. This approach helps the project managers to anticipate and estimate the efforts for development projects preferably less than 10 Person months. We have achieved approximately 30% improvement in effort variance by following this approach. Keywords—Software Estimation, Intermediate COCOMO

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Improved COCOMO based Model to Estimate the Effort of Software Projects

One of important aspects of software projects is estimating the cost and time required to develop projects. Nowadays, this issue has become one of the key concerns of project managers. Accurate estimation of essential effort to produce and develop software is heavily effective on success or failure of software projects and it is highly regarded as a vital factor. Failure to achieve convincing a...

متن کامل

A New Empirical Model to Increase the Accuracy of Software Cost Estimation (TECHNICAL NOTE)

We can say a software project is successful when it is delivered on time, within the budget and maintaining the required quality. However, nowadays software cost estimation is a critical issue for the advance software industry. As the modern software’s behaves dynamically so estimation of the effort and cost is significantly difficult. Since last 30 years, more than 20 models are already develo...

متن کامل

COCOMO II Calibration and Plans

COCOMO II is an effort to update software cost estimation models, such as the 1981 COnstructive Cost MOdel and its 1987 Ada COCOMO update. Both these models have experienced difficulties in estimating software projects of the 90s due to challenges such as non-sequential and rapid-development process models; reuse-driven approaches involving commercial-off-the-shelf (COTS) packages, reengineerin...

متن کامل

A Hybrid Intelligent Model to Increase the Accuracy of COCOMO

Nowadays, effort estimation in software projects is turned to one of the key concerns for project managers. In fact, accurately estimating of essential effort to produce and improve a software product is effective in software projects success or fail, which is considered as a vital factor. Lack of access to satisfying accuracy and little flexibility in existing estimation models have attracted ...

متن کامل

Estimating Development Effort of Software Projects using ANFIS

Software Effort Prediction is the process of estimating the effort required to develop software. Effectively controlling the expensive investment of software development is achieved by accurately estimating the effort. Effort estimation at the early stage of software development is very difficult because of lot of uncertainty in input parameters which decides the software effort. Adaptive Neuro...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • JSW

دوره 3  شماره 

صفحات  -

تاریخ انتشار 2008