On the uniqueness of operation days and delivery commitment generation for train timetables
نویسندگان
چکیده
In the 2014 finalised timetable for Sweden 314 operation days had a unique set of trains i.e. a unique traffic pattern. Despite this, the finalised timetable generally provides only one conflict resolved train path for each train, and this train path is to be used for all of the train’s operation days. Further, once the yearly timetable has been finalised train paths may not be changed, causing great inflexibility in later planning stages. Rather than finalizing entire train paths only certain characteristics of a train path, called delivery commitments, could be finalised. This allows for more flexibility in later planning stages. Delivery commitments could e.g. be arrival and departure times at important locations or the total running time, depending on the needs of the operator. In this paper we present a method for generating delivery commitments based on analyzing a yearlong timetable, called the control timetable. The control timetable is constructed using rolling horizon planning and a MIP-model that optimises the train paths for each day individually. Further, different train path characteristics are optimized for different operators. The proposed method was tested in a case study from Sweden. The results show that by constructing one train path for each individual day rather than one for the entire year the resulting delivery commitments allow for a more efficient use of infrastructure. The results also show that the proposed method allows for different train path characteristics to be optimised for different operators.
منابع مشابه
A discrete-event optimization framework for mixed-speed train timetabling problem
Railway scheduling is a complex task of rail operators that involves the generation of a conflict-free train timetable. This paper presents a discrete-event simulation-based optimization approach for solving the train timetabling problem to minimize total weighted unplanned stop time in a hybrid single and double track railway networks. The designed simulation model is used as a platform for ge...
متن کاملOn the delivery robustness of train timetables with respect to production replanning possibilities
Measuring timetable robustness is a complex task. Previous efforts have mainly been focused on simulation studies or measurements of time supplements. However, these measurements don't capture the production flexibility of a timetable, which is essential for measuring the robustness with regard to the trains' commercial activity commitments, and also for merging the goals of robustness and effi...
متن کاملIncorporating Wind Power Generation And Demand Response into Security-Constrained Unit Commitment
Wind generation with an uncertain nature poses many challenges in grid integration and secure operation of power system. One of these operation problems is the unit commitment. Demand Response (DR) can be defined as the changes in electric usage by end-use customers from their normal consumption patterns in response to the changes in the price of electricity over time. Further, DR can be also d...
متن کاملDegree of Optimality as a Measure of Distance of Power System Operation from Optimal Operation
This paper presents an algorithm based on inter-solutions of having scheduled electricity generation resources and the fuzzy logic as a sublimation tool of outcomes obtained from the schedule inter-solutions. The goal of the algorithm is to bridge the conflicts between minimal cost and other aspects of generation. In the past, the optimal scheduling of electricity generation resources has been ...
متن کاملOperation Planning of Wind Farms with Pumped Storage Plants Based on Interval Type-2 Fuzzy Modeling of Uncertainties
The operation planning problem encounters several uncertainties in terms of the power system’s parameters such as load, operating reserve and wind power generation. The modeling of those uncertainties is an important issue in power system operation. The system operators can implement different approaches to manage these uncertainties such as stochastic and fuzzy methods. In this paper, new ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2015