Interior point method for long-term generation scheduling of large-scale hydrothermal systems

نویسندگان

  • Anibal Tavares Azevedo
  • Aurelio Ribeiro Leite Oliveira
  • Secundino Soares
چکیده

This paper presents an interior point method for the long-term generation scheduling of large-scale hydrothermal systems. The problem is formulated as a nonlinear programming one due to the nonlinear representation of hydropower production and thermal fuel cost functions. Sparsity exploitation techniques and an heuristic procedure for computing the interior point method search directions have been developed. Numerical tests in case studies with systems of different dimensions and inflow scenarios have been carried out in order to evaluate the proposed method. Three systems were tested, with the largest being the Brazilian hydropower system with 74 hydro plants distributed in several cascades. Results show that the proposed method is an efficient and robust tool for solving the long-term generation scheduling problem.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Generation Scheduling in Large-Scale Power Systems with Wind Farms Using MICA

The growth in demand for electric power and the rapid increase in fuel costs, in whole of theworld need to discover new energy resources for electricity production. Among of the nonconventionalresources, wind and solar energy, is known as the most promising deviceselectricity production in the future. In this thesis, we study follows to long-term generationscheduling of power systems in the pre...

متن کامل

A SIMPLIFIED LAGRANGIAN MULTIPLIER APPROACH FOR FIXED HEAD SHORT-TERM HYDROTHERMAL SCHEDULING

This paper presents a simplifiedlagrangian multiplier based algorithm to solve the fixed head hydrothermalscheduling problem. In fixed head hydrothermal scheduling problem, waterdischarge rate is modeled as quadratic function of hydropower generation andfuel cost is modeled as quadratic function of thermal power generation. Thepower output of each hydro unit varies with the rate of water discha...

متن کامل

A Comprehensive Study of Several Meta-Heuristic Algorithms for Open-Pit Mine Production Scheduling Problem Considering Grade Uncertainty

It is significant to discover a global optimization in the problems dealing with large dimensional scales to increase the quality of decision-making in the mining operation. It has been broadly confirmed that the long-term production scheduling (LTPS) problem performs a main role in mining projects to develop the performance regarding the obtainability of constraints, while maximizing the whole...

متن کامل

An adaptive modified firefly algorithm to unit commitment problem for large-scale power systems

Unit commitment (UC) problem tries to schedule output power of generation units to meet the system demand for the next several hours at minimum cost. UC adds a time dimension to the economic dispatch problem with the additional choice of turning generators to be on or off.  In this paper, in order to improve both the exploitation and exploration abilities of the firefly algorithm (FA), a new mo...

متن کامل

Short-Term Hydrothermal Generation Scheduling Model Using a Genetic Algorithm

A new model to deal with the short-term generation scheduling problem for hydrothermal systems is proposed. Using genetic algorithms (GAs), the model handles simultaneously the subproblems of short-term hydrothermal coordination, unit commitment, and economic load dispatch. Considering a scheduling horizon period of a week, hourly generation schedules are obtained for each of both hydro and the...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Annals OR

دوره 169  شماره 

صفحات  -

تاریخ انتشار 2009