A novel earned value management model using Z-number

نویسندگان

  • Mostafa Salari
  • Morteza Bagherpour
  • John Wang
چکیده

The earned value management (EVM) model is an essential technique for managing and forecasting project features such as scheduling and cost performances indexes. This paper presents a novel fuzzy earned-value model based on Z-number theory incorporating both the impreciseness of real life conditions and a degree of reliability through considering an expert judgment process. The latter factor has not been used by other researchers in the field. The proposed model provides a reliable assessment for the progress performance of a project and its ‘at completion’ cost in an uncertain environment. Finally, an illustrative case demonstrates the applicability of the proposed model in real life projects.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Estimation of Project Performance Using Earned Value Management and Fuzzy Regression

Earned Value Management is a critical project managementmethodology that evaluates project performance from cost andschedule viewpoints. The novel theoretical framework presented in thispaper estimates future performance of project regarding the past relativeinformation. It benefits from fuzzy regression (FR) models in estimationprocess in order to deal with the vagueness and impreciseness ofre...

متن کامل

Predicting project time and costs using earned value management based on trapezoidal fuzzy numbers

Projects include activities that must be carried out at certain dates, with specified costs and determined qualities in order to satisfy the stakeholders. Project control is one of the most important and widely used issues in project-based organizations and it has attracted a lot of attention. So far, in the field of project control, there have been a lot of research that were done in different...

متن کامل

A COMPARATIVE MODEL OF EVM AND PROJECT’S SCHEDULE RISK ANALYSIS USING MONTE CARLO SIMULATION

<span style="color: #000000; font-family: Tahoma, sans-serif; font-size: 13px; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: auto; text-align: justify; text-indent: 0px; text-transform: none; white-space: normal; widows: auto; word-spacing: 0px; -webkit-text-stroke-width: 0px; display: inline !important; float: none; backgro...

متن کامل

A COMPARATIVE MODEL OF EVM AND PROJECT’S SCHEDULE RISK ANALYSIS USING MONTE CARLO SIMULATION

<span style="color: #000000; font-family: Tahoma, sans-serif; font-size: 13px; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: auto; text-align: justify; text-indent: 0px; text-transform: none; white-space: normal; widows: auto; word-spacing: 0px; -webkit-text-stroke-width: 0px; display: inline !important; float: none; backgro...

متن کامل

Establishing Control Limits on Time Performance Indicators of Projects through Monte Carlo Simulation and Earned Duration Management

Earned Duration Management (EDM) method has been developed to enhance Earned Value Management and to solve some of its problems, such as separation of measuring time and cost dimensions. By providing performance indicators, this method makes it possible for managers to accurately measure the progress of a project and to calculate the time and cost required to complete it. Nevertheless, the acce...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • IJADS

دوره 7  شماره 

صفحات  -

تاریخ انتشار 2014