Simulation Analysis of Rock Braking Mechanism of Tunnel Boring Machine

نویسندگان

  • Lida Zhu
  • Tianhua Wei
  • Baoguang Liu
  • Tianbiao Yu
چکیده

Original scientific paper Aiming at answering the questions of wear and failure of hob in the rock breaking process, the rock breaking process was simulated in different broken rock conditions by using finite element method. The relationship between normal force, lateral force, rolling force and time was obtained by rock breaking simulation analysis on the single edge disc cutter. The rock stress was analysed by setting different cutting depth when the stress reaches the maximum compressive strength of the rock. The best cutter space was also obtained in a certain depth by analysing the stress state of the cutter in different cutter space. The paper concluded with the effect of the disc cutter cross section shape on the wear. Therefore the study provided references for the wear and the optimized design of hob on Tunnel Boring Machine.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Simulation of tunnel boring machine utilization: A case study

Utilization is one of the main managerial factors that is applied for construction process analysis well. It directly affects the project duration and construction costs. Therefore, a utilization study in tunneling projects is essential. In this work, the utilization of an earth pressure balance Tunnel Boring Machine (TBM) in Tabriz urban railway project was studied using the Monte Carlo simula...

متن کامل

Estimation of penetration rate of tunnel boring machines using Monte-Carlo simulation method

One of the most important parameters used for determining the performance of tunnel boring machines (TBMs) is their penetration rate. The parameters affecting the penetration rate can be divided in two categories. The first category is the controllable parameters such as the TBM technical characteristics, and type and geometry of the tunnel, and the second one is the uncontrollable parameters s...

متن کامل

TUNNEL BORING MACHINE PENETRATION RATE PREDICTION BASED ON RELEVANCE VECTOR REGRESSION

key factor in the successful application of a tunnel boring machine (TBM) in tunneling is the ability to develop accurate penetration rate estimates for determining project schedule and costs. Thus establishing a relationship between rock properties and TBM penetration rate can be very helpful in estimation of this vital parameter. However, this parameter cannot be simply predicted since there ...

متن کامل

Airflow inside tunnel boring machine: A numerical study and an experimental verification

Knowledge of the airflow distribution inside a Tunnel Boring Machine (TBM) can create a safe working environment for workers and machinery. The airflow quality and the related mass flow rate in the ventilation system should be sufficient to dilute gases and remove dust inside the tunnel. In this work, airflow distribution in the single shield TBM tunnel was studied using computational fluid dyn...

متن کامل

Evaluation of TBM Utilization Using Rock Mass Rating System: A Case Study of Karaj-Tehran Water Conveyance Tunnel (Lots 1 and 2)

Successful application of a TBM in a project requires investigating both the ground conditions and the machine and backup system design features. Prediction of the machine performance is very important as it has a big effect on the duration of the project and the costs. In this respect, both penetration rate and advance rate must be estimated. Utilization factor, which depends on the type of op...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016