Structuring Of Early Design Decisions In Large Infrastructure Tenders – How To Find The Optimal Design Solution?

نویسنده

  • J. P. van der Meer
چکیده

Decision making in the tender phase of large infrastructural projects is a complex task for contractors as they have to make design decisions with long term effects and based on complex client requirements. Further complexity is added by the constrained environment of a tender and the uncertainty of winning the tender. As the context and the project are unique, there are no standard models for organizing the decision making during a tender. The introduction of Systems Engineering (SE) in the construction industry has led to a more structured way of working, but the application of the methods in the tender phase does not provide a suitable structure for organizing the decision making. As a result contractors struggle with designing an optimal design solution that will convince the client but will also reduce the risks associated with the construction and maintenance of the solution. In this paper we explore the implementation difficulties of SE in a large infrastructural tender. We report our initial findings of this in-depth single case study comprising document studies and open interviews with the tender team. We found that the allocation of design responsibilities between subsystems hampers cooperation for the integration of design and that the used SE approach lacks guidance for organizing a collaborative design process. We make propositions for further research and recommendations based on these initial findings.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Optimal design of cross docking supply chain networks with time-varying uncertain demands

This paper proposes an integrated network design model for a post-distribution cross-docking strategy, comprising multi product production facilities with shared production resources, capacitated cross docks with setup cost and customer zones with time windows constraints. The model is dynamic in terms of time-varying uncertain demands, whereas uncertainty is expressed with scenario approach an...

متن کامل

OPTIMAL DESIGN OF REINFORCED CONCRETE ONE-WAY RIBBED SLABS USING IMPROVED TIME EVOLUTIONARY OPTIMIZATION

In this paper, a new robust metaheuristic optimization algorithm called improved time evolutionary optimization (ITEO) is applied to design reinforced concrete one-way ribbed slabs. Geometric and strength characteristics of concrete slabs are considered as design variables. The optimal design is such that in addition to achieving the minimum cost, all design constraints are satisfied under Amer...

متن کامل

A Hybrid Solution Approach Based on Benders Decomposition and Meta-Heuristics to Solve Supply Chain Network Design Problem

Supply Chain Network Design (SCND) is a strategic supply chain management problem that determines its configuration. This mainly focuses on the facilities location, capacity sizing, technology selection, supplier selection, transportation, allocation of production and distribution facilities to the market, and so on. Although the optimal solution of the SCND problem leads to a significant reduc...

متن کامل

Design of a Mathematical Model for Logistic Network in a Multi-Stage Multi-Product Supply Chain Network and Developing a Metaheuristic Algorithm

Logistic network design is one of the most important strategic decisions in supply chain management that has recently attracted the attention of many researchers. Transportation network design is then one of the most important fields of logistic network. This study is concerned with designing a multi-stage and multi-product logistic network. At first, a mixed integer nonlinear programming model...

متن کامل

OPTIMAL SHAPE DESIGN OF GRAVITY DAMS BASED ON A HYBRID META-HERURISTIC METHOD AND WEIGHTED LEAST SQUARES SUPPORT VECTOR MACHINE

A hybrid meta-heuristic optimization method is introduced to efficiently find the optimal shape of concrete gravity dams including dam-water-foundation rock interaction subjected to earthquake loading. The hybrid meta-heuristic optimization method is based on a hybrid of gravitational search algorithm (GSA) and particle swarm optimization (PSO), which is called GSA-PSO. The operation of GSA-PSO...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013