Predictive -Reactive Scheduling for the Single Machine Problem
نویسندگان
چکیده
We propose a predictive-reactive approach for the single machine problem. It constructs a set of schedules following a partial order and, every time a decision should be taken, uses the temporal flexibility and the flexibility in job sequencing introduced to provide the decision-maker a set of alternatives, compatible with the modeled constraints.
منابع مشابه
Single-machine scheduling considering carryover sequence-dependent setup time, and earliness and tardiness penalties of production
Production scheduling is one of the very important problems that industry and production are confronted with it. Production scheduling is often planned in the industrial environments while productivity in production can improve significantly the expansion of simultaneous optimization of the scheduling plan. Production scheduling and production are two areas that have attracted much attention in...
متن کاملGENETIC AND TABU SEARCH ALGORITHMS FOR THE SINGLE MACHINE SCHEDULING PROBLEM WITH SEQUENCE-DEPENDENT SET-UP TIMES AND DETERIORATING JOBS
This paper introduces the effects of job deterioration and sequence dependent set- up time in a single machine scheduling problem. The considered optimization criterion is the minimization of the makespan (Cmax). For this purpose, after formulating the mathematical model, genetic and tabu search algorithms were developed for the problem. Since population diversity is a very important issue in ...
متن کاملMinimizing the Number of Tardy Jobs in the Single Machine Scheduling Problem under Bimodal Flexible and Periodic Availability Constraints
In single machine scheduling problems with availability constraints, machines are not available for one or more periods of time. In this paper, we consider a single machine scheduling problem with flexible and periodic availability constraints. In this problem, the maximum continuous working time for each machine increases in a stepwise manner with two different values allowed. Also, the durati...
متن کاملMinimizing Total Weighted Tardiness with Drop Dead Dates in Single Machine Scheduling Problem
This paper deals with minimization of tardiness in single machine scheduling problem when each job has two different due-dates i.e. ordinary due-date and drop dead date. The drop dead date is the date in which jobs’ weights rise sharply or the customer cancels the order. A linear programming formulation is developed for the problem and since the problem is known to be NP-hard, three heuristic...
متن کاملA Mathematical Programming Model and Genetic Algorithm for a Multi-Product Single Machine Scheduling Problem with Rework Processes
In this paper, a multi-product single machine scheduling problem with the possibility of producing defected jobs, is considered. We concern rework in the scheduling environment and propose a mixed-integer programming (MIP) model for the problem. Based on the philosophy of just-in-time production, minimization of the sum of earliness and tardiness costs is taken into account as the objective fu...
متن کاملJIT single machine scheduling problem with periodic preventive maintenance
This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, mult...
متن کامل