The Shortage Study of EOQ Model with Defective and Reworked Items
نویسنده
چکیده
The main purpose of this paper is to determine the value of economic order quantity (EOQ) with two types of imperfect items, defective and reworked ones, under 100% inspection. Where defective items are treated as scraps and reworked ones will be sent back to supplier to get repaired. A mathematical model is built on the jo in t d ist ribut ion o f defective and reworked un its which fo llow a multivariate hypergeometric distribution given that above two items come from some uniform distribution separately. We extend the study to shortage cases that may occur due to the lack of good items to fulfill demand rate during an order cycle, therefore, it is assumed that manufacturer has to pay additional penalty when the shortage occurs. The expected total cost per unit time is then calculated over its corresponding probabilit ies as well as the expected total cost. Finally, a numerical computation is provided to illustrate the conclusive outcome of proposed model.
منابع مشابه
A new study of an EOQ model for deteriorating items with shortages under inflation and time discounting
We discuss the effects of inflation and time discounting on an EOQ model for deteriorating items under stock-dependent demand and time-dependent partial backlogging. The inventory model is studied under the replenishment policy starting with no shortages. We then use MATLAB to find the optimal replenishment policies. The objective of this model is to maximize the total profit (TP) which inclu...
متن کاملOptimal lot sizing in screening processes with returnable defective items
This paper is an extension of Hsu and Hsu (Int J Ind Eng Comput 3(5):939–948, 2012) aiming to determine the optimal order quantity of product batches that contain defective items with percentage nonconforming following a known probability density function. The orders are subject to 100 % screening process at a rate higher than the demand rate. Shortage is backordered, and defective items...
متن کاملAn EOQ model with imperfect quality items, inspection errors, shortage backordering, and sales returns
In practice the items received in a lot may contain defective items, and the screening process to eliminate the defective items may involve both a Type I and a Type II error. Due to the defective items and the inspection errors, shortages may sometimes occur. In this paper, we develop an economic order quantity model with imperfect quality items, inspection errors, shortage backordering, and sa...
متن کاملBatching work and rework processes with limited deterioration of reworkables
We study the problem of planning the production of new and recovering defective items of the same product manufactured on the same facility. Items of the product are produced in batches. The processing of a batch includes two stages. In the first work stage, all items of a batch are manufactured and good quality items go to the inventory to satisfy given demands. In the second rework stage, som...
متن کاملAn inventory model for non-instantaneous deteriorating items with imperfect quality, delay in payments and time value money
In this paper, Economic Order Quantity ( ) based model for non-instantaneous deteriorating items with imperfect quality, permissible delay in payments and inflation is proposed. We adopt a time-dependent demand function. Also, the effects of time value of money are studied using the Discounted Cash Flow approach. Moreover, we assume that orders may contain a random proportion of defective items...
متن کامل