COAST GUARD Actions Needed to Mitigate Deepwater Project Risks

نویسنده

  • JayEtta Hecker
چکیده

We appreciate the opportunity to testify on the Deepwater Capability Replacement Project, which was initiated by the Coast Guard to replace and modernize its aging fleet of over 90 cutters and 200 aircraft used beyond 50 miles from shore. This project, the largest acquisition ever attempted by the Coast Guard, will likely cost over $10 billion or more and will not be completed for 2 to 3 decades. Already, the Coast Guard has spent about $116 million on the project's design, and this year is asking for $338 million to begin the acquisition phase. The Congress and the Coast Guard are now at a major crossroads with the Deepwater Project, in that the planning is essentially complete, and the Congress is now being asked to commit to a multibillion dollar project that will define the way the Coast Guard performs many of its missions for decades to come. The acquisition strategy the Coast Guard has chosen for the Deepwater Project is unique and untried for a project of this magnitude. It carries many risks that could potentially cause significant schedule delays and cost increases. Since 1998, we have reviewed numerous aspects of this project at the request of this Subcommittee and others. Most recently, we evaluated the major risks associated with the project, and our testimony today is based on a report 1 released earlier this week. We will discuss risks the project faces in four major areas: (1) planning the project around annual funding levels far above what the administration has told the Coast Guard it can expect to receive, (2) keeping costs under control in the contract's later years, (3) ensuring that procedures and personnel are in place for managing and overseeing the contractor once the contract is awarded, and (4) minimizing potential problems with developing unproven technology. In summary: Affordability is a major risk for the Deepwater Project. The Coast Guard has chosen a contracting approach that depends on a sustained funding stream of over $500 million each year (in 1998 dollars) for the next 20 years or more. Contractors now competing for the right to acquire the entire deepwater system have been told to plan their entire proposals around this level of funding. According to budget projections from the Office of Management and Budget (OMB), the Coast Guard faces the real possibility that $500 million annually will not be available for the project and that the …

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A visual analytics process for maritime response, resource allocation and risk assessment

In this paper, we present our collaborative work with the U.S. Coast Guard’s Ninth District and Atlantic Area Commands where we developed a visual analytics system to analyze historic response operations and assess the potential risks in the maritime environment associated with the hypothetical allocation of Coast Guard resources. The system includes linked views and interactive displays that e...

متن کامل

The Coast Guard's KSS Project

Since June 1986, the University of Pennsylvania has been under contract with the Coast Guard to provide support for the Coast Guard's KSS (knowledge-based decision support systems) project. A principal output of the KSS project has been Max, a DSS shell or environment, originally designed to support modeling tasks during decision making for ship acquisition. Max is innovative in a number of way...

متن کامل

Next Generation Differential GPS Architecture

The United States Coast Guard is engaged in a project to re-capitalize Reference Station (RS) and Integrity Monitor (IM) equipment used in the Nationwide Differential Global Position System (NDGPS). The Coast Guard in partnership with industry is developing a new software application to run on an open

متن کامل

Safety Risks Impacts Analysis on Construction Project Objectives Using a Hybrid Model of Fuzzy Expert System and Latin Hyper Cube Sampling

Background and aims: The construction industry has a high rate of fatal or nonfatal injuries and all around the world which remains one of the most dangerous occupations till now. Since project safety and measuring danger in the construction industry is a crucial subject, so this study aimed to measure the impacts of safety risks on the time and cost objectives of project using a hybrid method ...

متن کامل

Hookahs: Hot and Hazardous

In July 2011 the NIH announced a new fiveyear, $25.2-million project to conduct research on health effects of the BP Deepwater Horizon disaster of 2010. Led by the NIEHS, the project will support population-based and laboratory studies at four Gulf Coast universities. The universities will partner with community organizations to incorporate local concerns into study designs and communicate find...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2001