Evaluating the cost effectiveness of donepezil in the treatment of Alzheimer's disease in Germany using discrete event simulation
نویسندگان
چکیده
BACKGROUND Previous cost-effectiveness studies of cholinesterase inhibitors have modeled Alzheimer's disease (AD) progression and treatment effects through single or global severity measures, or progression to "Full Time Care". This analysis evaluates the cost-effectiveness of donepezil versus memantine or no treatment in Germany by considering correlated changes in cognition, behavior and function. METHODS Rates of change were modeled using trial and registry-based patient level data. A discrete event simulation projected outcomes for three identical patient groups: donepezil 10 mg, memantine 20 mg and no therapy. Patient mix, mortality and costs were developed using Germany-specific sources. RESULTS Treatment of patients with mild to moderately severe AD with donepezil compared to no treatment was associated with 0.13 QALYs gained per patient, and 0.01 QALYs gained per caregiver and resulted in average savings of €7,007 and €9,893 per patient from the healthcare system and societal perspectives, respectively. In patients with moderate to moderately-severe AD, donepezil compared to memantine resulted in QALY gains averaging 0.01 per patient, and savings averaging €1,960 and €2,825 from the healthcare system and societal perspective, respectively.In probabilistic sensitivity analyses, donepezil dominated no treatment in most replications and memantine in over 70% of the replications. Donepezil leads to savings in 95% of replications versus memantine. CONCLUSIONS Donepezil is highly cost-effective in patients with AD in Germany, leading to improvements in health outcomes and substantial savings compared to no treatment. This holds across a variety of sensitivity analyses.
منابع مشابه
Cost effectiveness of donepezil in the treatment of mild to moderate Alzheimer's disease: a UK evaluation using discrete-event simulation.
Recommendations in the UK suggest restricting treatment of Alzheimer's disease with cholinesterase inhibitors, on cost-effectiveness grounds, to patients with moderate cognitive decline. As the economic analyses that informed these recommendations have been the subject of debate, we sought to address the potential limitations of existing models and produce estimates of donepezil treatment cost ...
متن کاملModeling a Smart Hospital Information Architecture Based on Internet of Things and Recommender Agent
Introduction: Today, healthcare organizations worldwide are aware of the significance of technology and its impact on the quality of care. Hospitals are one of the most crucial systems in which the utilization of information is particularly important for several reasons. Using discrete-event simulation and developing a recommender agent, this study aimed to allocate IoT devices to patients in s...
متن کاملModeling a Smart Hospital Information Architecture Based on Internet of Things and Recommender Agent
Introduction: Today, healthcare organizations worldwide are aware of the significance of technology and its impact on the quality of care. Hospitals are one of the most crucial systems in which the utilization of information is particularly important for several reasons. Using discrete-event simulation and developing a recommender agent, this study aimed to allocate IoT devices to patients in s...
متن کاملDetermination of optimum of production rate of network failure prone manufacturing systems with perishable items using discrete event simulation and Taguchi design of experiment
This paper, considers Network Failure Manufacturing System (NFPMS) and production control policy of unreliable multi-machines, multi-products with perishable items. The production control policy is based on the Hedging Point Policy (HPP). The important point in the simulation of this system is assumed that the customers who receive perishable item are placed in priority queue of the customers w...
متن کاملConcurrent control on resource planning and revenue/expenditure estimation in large-scale shell material embankment projects management using discrete-event simulation
Resource planning in large-scale construction projects has been a complicated management issue requiring mechanisms to facilitate decision making for managers. In the present study, a computer-aided simulation model is developed based on concurrent control of resources and revenue/expenditure. The proposed method responds to the demand of resource management and scheduling in shell material emb...
متن کامل