Factors of Complexity in Construction Projects

نویسندگان

  • Hannah Wood
  • Philip Ashton
چکیده

Construction projects are often described as being complex; however, the relationship between project complexity and other key project components such as risk and uncertainty is not widely established. As part of a global research project aimed at establishing the impact of project complexity at the pre construction stage, research has been carried out to investigate this relationship. Interviews with industry experts were conducted to establish a current definition of project complexity in the context of the construction industry as well as to identify the factors of project complexity and other aspects of a project. At this stage in the research the definition has been established and factors have been identified but there is a need to develop a method to measure the effect of these. A function has been developed to show the importance of each factor to the complexity of a project which will aid in future work developing a methodology for measuring complexity and its impact upon projects.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Developing a fuzzy group decision making approach for project manager selection considering the static complexity of construction projects

Due to the particular importance of projects in human life and in organizations, proper project management has been always regarded highly by researchers and practitioners. Recent advances in technology and fundamental changes in most scientific areas have affected projects and made their nature and environmental circumstances much more complex than in the past. Fortunately, in recent years, ma...

متن کامل

Analysis on Components Complexity During Execution of Construction Projects

Development is the fundamental area in enabling India`s economy and urban and provincial structure. Development is a multi-connected structure where all variables are bury connected and multi-centered. All the three limitations time, expense and quality ought to be adjusted in an improved way, so that no segment gets influenced by dismissing those. The goal of this study is to distinguish the m...

متن کامل

DEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY

Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the h...

متن کامل

Factor Analysis of Risk Variables Affecting Occupational Injuries: A Field Study in Construction Projects

Background and Objective: Approximately, half of the occupational accidents are associated with the construction industry in Iran. Therefore, the factor analysis of risk variables affecting occupational injuries in the construction industry can lead to understanding and reducing the rate of injuries in these projects. The purpose of this study was to identify the risk factors affecting the type...

متن کامل

The construction projects HSE performance evaluation considering the effect of external factors using Choquet integral, case study (an Iranian power plant construction company)

Nowadays, industrialization exposes the human and environment resources to serious dangers. The importance of these resources caused the HSE (health, safety and environment) to have a significant contribution in industries’ evaluation, especially in construction industry. While evaluating the project’s success from an HSE point of view, it is not enough to rely solely on the outputs without con...

متن کامل

A cause and effect decision making model of factors influencing falling from height accidents in construction projects using Fuzzy-DEMATEL technique

Background and aims: All construction projects carry some levels of risk. The construction projects involve numerous uncertainties, multiple intricacies, varies techniques, and divergent environments. So that, workers in the construction industry are at greater risk because of the dynamic nature of the activities and momentous changes in working conditions in comparison with other industries. T...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2009