Dynamic Planning and Scheduling for One-of-a-kind Assembly Production
نویسندگان
چکیده
A one-of-a-kind assembly production system is considered. In this system, every product has its own tree structure process route. The new order for the customized product arrives randomly and follows some known probability distribution. The objective is to assign an early due date to every new ordered product and guarantee that no already-arrived product will be delayed. In order to achieve this goal, we analyze the reasons that lead to tardiness in the considered production system and provide two types of effective dispatching rules that are combined by the three indices that represent the urgency of an operation in two different ways. Then we integrate the proposed rule into the binary searching algorithm for assigning due date. Numerical experiments indicate that the proposed integrated dynamic planning and scheduling algorithm assign comparatively early due dates to newly arrived orders and meanwhile guarantee the delivery reliability of all products.
منابع مشابه
Optimisation of assembly scheduling in VCIM systems using genetic algorithm
Assembly plays an important role in any production system as it constitutes a significant portion of the lead time and cost of a product. Virtual computer-integrated manufacturing (VCIM) system is a modern production system being conceptually developed to extend the application of traditional computer-integrated manufacturing (CIM) system to global level. Assembly scheduling in VCIM systems is ...
متن کاملA multi-objective genetic algorithm (MOGA) for hybrid flow shop scheduling problem with assembly operation
Scheduling for a two-stage production system is one of the most common problems in production management. In this production system, a number of products are produced and each product is assembled from a set of parts. The parts are produced in the first stage that is a fabrication stage and then they are assembled in the second stage that usually is an assembly stage. In this article, the first...
متن کاملMulti-objective scheduling and assembly line balancing with resource constraint and cost uncertainty: A “box” set robust optimization
Assembly lines are flow-oriented production systems that are of great importance in the industrial production of standard, high-volume products and even more recently, they have become commonplace in producing low-volume custom products. The main goal of designers of these lines is to increase the efficiency of the system and therefore, the assembly line balancing to achieve an optimal system i...
متن کاملAn application of principal component analysis and logistic regression to facilitate production scheduling decision support system: an automotive industry case
Production planning and control (PPC) systems have to deal with rising complexity and dynamics. The complexity of planning tasks is due to some existing multiple variables and dynamic factors derived from uncertainties surrounding the PPC. Although literatures on exact scheduling algorithms, simulation approaches, and heuristic methods are extensive in production planning, they seem to be ineff...
متن کاملAn improved genetic algorithm for multidimensional optimization of precedence-constrained production planning and scheduling
Integration of production planning and scheduling is a class of problems commonly found in manufacturing industry. This class of problems associated with precedence constraint has been previously modeled and optimized by the authors, in which, it requires a multidimensional optimization at the same time: what to make, how many to make, where to make and the order to make. It is a combinatorial,...
متن کامل