This paper considers a two-stage hybrid flow shop scheduling problem. The objective is the minimizing of maximum completion time of all the jobs. There exist two dedicated machines at stage 1 and one machine at stage 2. Each job is defined by two operations processed on the two-stages in series. Depending on the job type, the job is processed on either of the two machines at stage1 and must be processed on the single machine at stage2. the jobs are transported between the stages by a robot or a conveyor. After the problem formulation, we present lower bounds for the objective function. We then discuss a few polynomially solvable cases of the problem and present the solution algorithms. Since a general case of the problem is strongly NP-hard, we propose two heuristics to find approximate solutions to the general case. Computational experiments are done on a number of randomly generated test problems, and the test results are reported.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Modeling the Hybrid Flow Shop Scheduling Problem Followed by an Assembly Stage Considering Aging Effects and Preventive Maintenance Activities

Scheduling problem for the hybrid flow shop scheduling problem (HFSP) followed by an assembly stage considering aging effects additional preventive and maintenance activities is studied in this paper. In this production system, a number of products of different kinds are produced. Each product is assembled with a set of several parts. The first stage is a hybrid flow shop to produce parts. All ...

متن کامل

Solving two-stage hybrid flow shop using climbing depth-bounded discrepancy search

This paper investigates how to adapt a discrepancy-based search method to solve two-stage hybrid flowshop scheduling problems in which each stage consists of several identical machines operating in parallel. The objective is to determine a schedule that minimizes the makespan. We present an adaptation of the Climbing Depth-bounded Discrepancy Search (CDDS) method based on Johnson’s rule and on ...

متن کامل

A comparison of algorithms for minimizing the sum of earliness and tardiness in hybrid flow-shop scheduling problem with unrelated parallel machines and sequence-dependent setup times

In this paper, the flow-shop scheduling problem with unrelated parallel machines at each stage as well as sequence-dependent setup times under minimization of the sum of earliness and tardiness are studied. The processing times, setup times and due-dates are known in advance. To solve the problem, we introduce a hybrid memetic algorithm as well as a particle swarm optimization algorithm combine...

متن کامل

Bi-objective Optimization for Just in Time Scheduling: Application to the Two-Stage Assembly Flow Shop Problem

This paper considers a two-stage assembly flow shop problem (TAFSP) where m machines are in the first stage and an assembly machine is in the second stage. The objective is to minimize a weighted sum of earliness and tardiness time for n available jobs. JIT seeks to identify and eliminate waste components including over production, waiting time, transportation, inventory, movement and defective...

متن کامل

Ordonnancement des systèmes de production flexibles soumis à différents types de contraintes de blocage. (Scheduling of flexible manufacturing systems subject to mixed blocking constraints)

This thesis deals mainly with makespan minimization in Flow-Shop and hybrid Flow-Shop scheduling problems where mixed blocking constraints are considered. In Flow-Shop scheduling problem, a set of N jobs must be executed on a set of M machines. All jobs require the same operation order that must be executed according to the same manufacturing process. Each machine can only execute one job at an...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2016