Beam Power Limitations during the TTF2 Injector Commissioning
نویسندگان
چکیده
منابع مشابه
The Sns Beam Diagnostics Experience and Lessons Learned
The Spallation Neutron Source accelerator systems are designed to deliver a 1.0 GeV, 1.4 MW proton beam to a liquid mercury target for neutron scattering research. The accelerator complex consists of an Hinjector, capable of producing one-ms-long pulses at 60 Hz repetition rate with 38 mA peak current; a 1 GeV linear accelerator; an accumulator ring; and associated transport lines. The accelera...
متن کاملCOMMISSIONING OF THE LNLS 500-MeV BOOSTER SYNCHROTRON
We present results of the commissioning of a new injector for the Brazilian Synchrotron Light Source. The new injector consists of the existing 125-MeV LINAC and a new 500-MeV booster synchrotron. At present, about 40 mA can be injected into the booster and about 15 mA can be ramped up to 500 MeV at a repetition rate of 0.17 Hz. The new injector has allowed the accumulation of up to 540 mA in t...
متن کاملCommissioning Results of the Lcls Injector*
The Linac Coherent Light Source (LCLS) is a SASE xray Free-Electron Laser (FEL) project presently under construction at SLAC [1]. The injector section, from drive-laser and RF photocathode gun through first bunch compressor chicane, was installed in fall 2006. Initial system commissioning with an electron beam has recently been completed. The second phase of construction, including second bunch...
متن کاملNsls-ii Injector System Diagnostics
The NSLS-II Injector System Diagnostics will provide instrumentation in the linac, Booster, Transfer Lines and Beam Dumps for measuring key beam parameters. These instruments will be adequate for staged commissioning of NSLS-II injectors, and will allow sufficient beam diagnostics for tune-up and top-up operations. This paper summarizes the status of the NSLS-II injector system diagnostics, foc...
متن کاملCommissioning of the 100 MeV Swiss Light Source Injector Linac
The 100 MeV injector for the Swiss Light Source, designed and delivered as turnkey system by ACCEL Instruments, was commissioned in April 2000 [1]. A description of the system consisting of electron source, buncher section, accelerating structures, rf power plant and control system will be given. Specified and measured beam parameters will be compared to show the performance of the entire system.
متن کامل