Solving the Resource Constrained Project Scheduling Problem to Minimize the Financial Failure Risk
نویسندگان
چکیده
In practice, a project usually involves cash inand outflows associated with each activity. This paper aims to minimize the payment failure risk during the project execution for the resource-constrained project scheduling problem (RCPSP). In such models, the money-time value, which is the product of the net cash in-flow and the time length from the completion time of each activity to the project deadline, provides a financial evaluation of project cash availability. The cash availability of a project schedule is defined as the sum of these money-time values associated with all activities, which is mathematically equivalent to the minimization objective of total weighted completion time. This paper presents four memetic algorithms (MAs) which differ in the construction of initial population and restart strategy, and a double variable neighborhood search algorithm for solving the RCPSP problem. An experiment is conducted to evaluate the performance of these algorithms based on the same number of solutions calculated using ProGen generated benchmark instances. The results indicate that the MAs with regret biased sampling rule to generate initial and restart populations outperforms the other algorithms in terms of solution quality. Keywords-RCPSP; cash availability; memetic algorithms; variable neighborhood search.
منابع مشابه
A Preemptive multimode resource constrained project scheduling model with cash flows
Resource constrained project scheduling problem is one of the most important issues in project planning and management. The objective function of this problem is to minimize the completion time of a project. When there is budget constraint or high risk for investment, using the criteria such as cash flows is so important. The development of computer systems and processors makes it possible to t...
متن کاملModeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition
In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...
متن کاملA multi-objective resource-constrained project scheduling problem with time lags and fuzzy activity durations
The resource-constrained project scheduling problem is to find a schedule that minimizes the project duration subject to precedence relations and resource constraints. To further account for economic aspects of the project, one may add an objective of cash nature to the problem. In addition, dynamic nature and variations in real world are known to introduce uncertainties into data. Therefore, t...
متن کاملResource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)
Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...
متن کاملAn Efficient Genetic Agorithm for Solving the Multi-Mode Resource-Constrained Project Scheduling Problem Based on Random Key Representation
In this paper, a new genetic algorithm (GA) is presented for solving the multi-mode resource-constrained project scheduling problem (MRCPSP) with minimization of project makespan as the objective subject to resource and precedence constraints. A random key and the related mode list (ML) representation scheme are used as encoding schemes and the multi-mode serial schedule generation scheme (MSSG...
متن کاملAn Optimization via Simulation approach for the preemptive and non-preemptive multi-mode resource-constrained project scheduling problems
In this paper a novel modelling and solving method has been developed to address the so-called resource constrained project scheduling problem (RCPSP) where project tasks have multiple modes and also the preemption of activities are allowed. To solve this NP-hard problem, a new general optimization via simulation (OvS) approach has been developed which is the main contribution of the current re...
متن کامل