New Insights on the Complexity of Resource- Constrained Project Scheduling - a Case of Single-mode Scheduling
نویسنده
چکیده
Complexity proofs often restrict themselves to stating that the problem at hand is a generalization of some other intractable problem. This proof technique relies on the widely accepted assumptions that complexity results hold regardless of the model formulation used to represent the problem and the encoding used to represent its instances. However, recent results indicate that these assumptions are not always justified. Brüggemann (1995) showed that for at least one model formulation of the discrete lotsizing and scheduling problem (DLSP) and certain, pathological instances the corresponding decision problem cannot be a member of NP; therefore that DLSP-model is exponential. With respect to the field of resource-constrained project scheduling, the question arises whether here this or a similar situation may occur as well. We extend the findings of Brüggemann to the single mode project scheduling problem (SMPSP) where we prove the well-known binary programming model of the SMPSP to be exponential as well regardless of the particular encoding used. In addition, we demonstrate that this result can be improved to a strongly NPequivalence result by adding one moderate restriction on the problem parameters.
منابع مشابه
The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem
This paper presents the formulation and solution of the Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem. The focus of the proposed method is not on finding a single optimal solution, instead on presenting multiple feasible solutions, with cost and duration information to the project manager. The motivation for developing such an approach is due in part to practica...
متن کاملAN EXPERIMENTAL INVESTIGATION OF THE SOUNDS OF SILENCE METAHEURISTIC FOR THE MULTI-MODE RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH PRE-OPTIMIZED REPERTOIRE ON THE HARDEST MMLIB+ SET
This paper presents an experimental investigation of the Sounds of Silence (SoS) harmony search metaheuristic for the multi-mode resource-constrained project scheduling problem (MRCPSP) using a pre-optimized starting repertoire. The presented algorithm is based on the time oriented version of the SoS harmony search metaheuristic developed by Csébfalvi et al. [1] for the single-mode resource-con...
متن کاملA New Bi-Objective Model for a Multi-Mode Resource-Constrained Project Scheduling Problem with Discounted Cash Flows and four Payment Models
The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...
متن کاملAn Efficient Genetic Agorithm for Solving the Multi-Mode Resource-Constrained Project Scheduling Problem Based on Random Key Representation
In this paper, a new genetic algorithm (GA) is presented for solving the multi-mode resource-constrained project scheduling problem (MRCPSP) with minimization of project makespan as the objective subject to resource and precedence constraints. A random key and the related mode list (ML) representation scheme are used as encoding schemes and the multi-mode serial schedule generation scheme (MSSG...
متن کاملA Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm
In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...
متن کاملAn Exact Algorithm for the Mode Identity Project Scheduling Problem
In this paper we consider the non-preemptive variant of a multi-mode resource constrained project scheduling problem (MRCPSP) with mode identity, in which a set of project activities is partitioned into disjoint subsets while all activities forming one subset have to be processed in the same mode. We present a depth-first branch and bound algorithm for the resource constrained project schedulin...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 1996