Research on Scheduling and Optimizing Design in the Upper-making Processes of Men's Shoes
نویسندگان
چکیده
Production efficiency of a sewing machine process has a direct influence on production efficiency of a related shoe factory. Because there are many upper-making processes with complicated techniques, it is essential to arrange and optimize the upper-making process. Through the research on both action and time of these processes, this paper shows examples that illustrate how to analyze the techniques of a sewing machine, ascertain the procedure and order of a process, and finally how to optimize and arrange all processes. The focuses of this study are that, managing the production time around an advantageous mode of production, reasonably arranging the employees, space layout and the performance of machines, putting forward a proposal for improving production efficiency, and further summarizing the upper-making process of men’s shoes with efficient productivity.
منابع مشابه
A Bilevel Scheduling Approach for Modeling Energy Transaction of Virtual Power Plants in Distribution Networks
By increasing the use of distributed generation (DG) in the distribution network operation, an entity called virtual power plant (VPP) has been introduced to control, dispatch and aggregate the generation of DGs, enabling them to participate either in the electricity market or the distribution network operation. The participation of VPPs in the electricity market has made challenges to fairly a...
متن کاملMinimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times
The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...
متن کاملبهینه سازی هزینه کل تولید و زمان در سلول رباتیک سه ماشین
In this research, robotic cell scheduling problem with three CNC machines and with an operation on each machine with the purpose of optimizing manufacturing cost and time in S1 cycle has been investigated. To obtain the optimal total cost of production has been used the optimal processing time on machine operation. In this research, robotic cell scheduling is studied in three different situatio...
متن کاملOptimizing the preventive maintenance scheduling by genetic algorithm based on cost and reliability in National Iranian Drilling Company
The present research aims at predicting the required activities for preventive maintenance in terms of equipment optimal cost and reliability. The research sample includes all offshore drilling equipment of FATH 59 Derrick Site affiliated with National Iranian Drilling Company. Regarding the method, the research uses a field methodology and in terms of its objectives, it is classified as an app...
متن کاملOptimizing a bi-objective preemptive multi-mode resource constrained project scheduling problem: NSGA-II and MOICA algorithms
The aim of a multi-mode resource-constrained project scheduling problem (MRCPSP) is to assign resource(s) with the restricted capacity to an execution mode of activities by considering relationship constraints, to achieve pre-determined objective(s). These goals vary with managers or decision makers of any organization who should determine suitable objective(s) considering organization strategi...