Minimizing the bicriteria of makespan and maximum tardiness with an upper bound on maximum tardiness

نویسندگان

  • Rubén Ruiz
  • Ali Allahverdi
چکیده

This paper studies the flowshop scheduling problem with a complex bicriteria objective function. A weighted sum of makespan and maximum tardiness subject to a maximum tardiness threshold value is to be optimized. This problem, with interesting potential applications in practice, has been sparsely studied in the literature. We propose global and local dominance relationships for the three machine problem and a fast and effective genetic algorithm (GA) for the more general m-machine case. The proposed GA incorporates a novel three-phase fitness assignment mechanism specially targeted at dealing with populations in which both feasible as well as infeasible solutions might coexist. Comprehensive computational and statistical experiments show that the proposed GA outperforms the two most effective existing heuristics by a considerable margin in all scenarios. Furthermore, the proposed GA is also faster and able to find more feasible solutions. It should be noted that when the weight assigned to maximum tardiness is zero, then the problem is reduced to minimizing makespan subject to a maximum tardiness threshold value. Heuristics for both problems have been provided in the literature recently but they have not been compared. Another contribution of this paper is to compare these recent heuristics with each other. 1 Corresponding author. Telephone number: +34 96 387 70 07, ext. 74946. Fax number: +34 96 387 74 99

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimizing the maximum tardiness and makespan criteria in a job shop scheduling problem with sequence dependent setup times

The job shop scheduling problem (JSP) is one of the most difficult problems in traditional scheduling because any job consists of a set operations and also any operation processes by a machine. Whereas the operation is placed in the machine, it is essential to be considering setup times that the times strongly depend on the various sequencing of jobs on the machines. This research is developed ...

متن کامل

Minimizing the Sum of Makespan and Maximum Tardiness on Single Machine with Release Dates

This paper considers the bicriteria scheduling problem of simultaneously minimizing makespan (Cmax) and maximum tardiness (Tmax) on a single machine with release dates. The problem is, by nature, NP-Hard. Therefore, one approximation algorithm (labeled as CTA1) was proposed for solving this problem. The CTA1 algorithm was compared with the Branch and Bounds (BB) procedure specifically implement...

متن کامل

Minimizing the total tardiness and makespan in an open shop scheduling problem with sequence-dependent setup times

We consider an open shop scheduling problem with setup and processing times separately such that not only the setup times are dependent on the machines, but also they are dependent on the sequence of jobs that should be processed on a machine. A novel bi-objective mathematical programming is designed in order to minimize the total tardiness and the makespan. Among several mult...

متن کامل

Solving a New Multi-objective Unrelated Parallel Machines Scheduling Problem by Hybrid Teaching-learning Based Optimization

This paper considers a scheduling problem of a set of independent jobs on unrelated parallel machines (UPMs) that minimizesthe maximum completion time (i.e., makespan or ), maximum earliness ( ), and maximum tardiness ( ) simultaneously. Jobs have non-identical due dates, sequence-dependent setup times and machine-dependentprocessing times. A multi-objective mixed-integer linear programmi...

متن کامل

Scheduling unit-length jobs with machine eligibility restrictions

We consider uniform parallel machine scheduling problems with unit-length jobs where every job is only allowed to be processed on a specified subset of machines. We develop efficient methods to solve problems with various objectives, including minimizing a total tardiness function, a maximum tardiness function, total completion time, the number of tardy jobs, the makespan, etc.

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:
  • Computers & OR

دوره 36  شماره 

صفحات  -

تاریخ انتشار 2009