In automated assembly of printed circuit boards, the placement sequencing and feeder configuration problems turns out to be two of the four major problems that need to be solved efficiently to get better utilization from the use of computer controlled electronic component placement machines. The forms of these problems may show variability depending on the architecture of the placement machine used. In this study one of such machine architectures is undertaken where the most difficult combination of placement sequencing and feeder configuration problems is faced. Given a placement sequencing problem, the feeder configuration problem turns out to be a quadratic assignment problem, and given a feeder configuration the placement sequencing problem turns out to be a traveling salesman problem. However these two problems are highly interdependent and as the overall solution is intractable a sequential and iterative solution procedure is suggested. The proposed solution procedure is applied to test problems in real printed circuit board assembly environments. Copyright © 2003 Author and ETAI Society
منابع مشابه
New Models and Heuristics for Component Placement in Printed Circuit Board Assembly
This paper considers an optimization problem arising in the automated manufacture of printed circuit boards. An essential part of this problem is to determine good component pick and place sequences as this can reduce the overall assembly time significantly. This component placement sequence problem can be modelled as a Travelling Salesman Problem, however complex machine and process specificat...
متن کاملEffective Heuristic and Metaheuristic Approaches to Optimize Component Placement in Printed Circuit Board Assembly
This paper considers a scheduling problem arising for numerically controlled machines in the manufacture of printed circuit boards. In order to maximize the throughput rate of these machines the time taken for the pick and place sequence of components for each board has to be minimized. The determination of good pick and place sequences on a single placement machine gives rise to three related ...
متن کاملScheduling and Feeder Arrangement for Simultaneous Pickup in PCB Assembly
In this paper, we propose a new method for reducing assembly time in printed circuit board (PCB) assembly by prioritizing efficient simultaneous pickup operation of placement machines. There are three major problems of the scheduling: (1) component feeder location (affects efficiency of pickup operation), (2) mounting sequencing (affects total distance of the mounting tour) , and (3) simultaneo...
متن کاملThe assembly of printed circuit boards: a case with multiple machines and multiple board types
In this paper a typical situation arising in the assembly of printed circuit boards is investigated. The planning problem we face is how to assemble boards of di erent types using a single line of placement machines. From a practical viewpoint, the multiplicity of board types adds signi cantly to the complexity of the problem, which is already very hard to solve in the case of a single board ty...
متن کاملThe assembly of printed circuit boards : a case withmultiple machines and multiple board
In this paper a typical situation arising in the assembly of printed circuit boards is investigated. The planning problem we face is how to assemble boards of di erent types using a single line of placement machines. From a practical viewpoint, the multiplicity of board types adds signi cantly to the complexity of the problem, which is already very hard to solve in the case of a single board ty...