Survey on Security Constraints and Real‐time Constraints in Real‐time Resource Limited System Group 10 Final Report Statement of the Problem
نویسنده
چکیده
Our project will focus on real time system with constraints on security, real-time performance and limited resource. It is the seeking for performance optimization after a trade of all the constraints considered. Namely, we will cover the following areas: (a) Secure wireless communication in MANETs (b) Scalable and lightweight secure group communication, including authentication of group members and group key management (c) Detection of attacks and malicious users (d) Energy-efficient communication in MANETs (e) Flexible and adaptive security policy management (f) Real-time fault-tolerance
منابع مشابه
A Multi-Mode Resource-Constrained Optimization of Time-Cost Trade-off Problems in Project Scheduling Using a Genetic Algorithm
In this paper, we present a genetic algorithm (GA) for optimization of a multi-mode resource constrained time cost trade off (MRCTCT) problem. The proposed GA, each activity has several operational modes and each mode identifies a possible executive time and cost of the activity. Beyond earlier studies on time-cost trade-off problem, in MRCTCT problem, resource requirements of each execution mo...
متن کاملFuzzy Real-Time Optimization of the Tennessee Eastman Challenge Process
A Real-Time Optimization (RTO) strategy incorporating the fuzzy sets theory is developed, where the problem constraints obtained from process considerations are treated in fuzzy environment. Furthermore, the objective function is penalized by a fuzzified form of the key process constraints. To enable using conventional optimization techniques, the resulting fuzzy optimization problem is the...
متن کاملA novel local search method for microaggregation
In this paper, we propose an effective microaggregation algorithm to produce a more useful protected data for publishing. Microaggregation is mapped to a clustering problem with known minimum and maximum group size constraints. In this scheme, the goal is to cluster n records into groups of at least k and at most 2k_1 records, such that the sum of the within-group squ...
متن کاملDynamic Cargo Trains Scheduling for Tackling Network Constraints and Costs Emanating from Tardiness and Earliness
This paper aims to develop a multi-objective model for scheduling cargo trains faced by the costs of tardiness and earliness, time limitations, queue priority and limited station lines. Based upon the Islamic Republic of Iran Railway Corporation (IRIRC) regulations, passenger trains enjoy priority over other trains for departure. Therefore, the timetable of cargo trains must be determined based...
متن کاملتدارک همزمان انرژی و ذخیره کنترل فرکانس اولیه بادرنظرگرفتن محدودیت گرفتگی خطوط
The simultaneous scheduling of energy and primary reserve is one of most important recent researches. However, in these researches, operation constraints and transmission limitations have been neglected. So it is possible that the power flow results be infeasible since some real constraints are not considered. In this paper congestion constraint in transmission lines, technical capabilities and...
متن کامل