Material planning for production kits under uncertainty
نویسندگان
چکیده
A kit is a specific collection of components and/or tools needed for completing a procedure or producing a product. A multiperiod material planning system for production kits under the demand and procurement lead-time uncertainty is considered when component sharing among kits is plausible. Simulation experiments show that component sharing improves the system’s service measure of average kit availability and average backorder quantity per period. Also, carrying component safety stock only enhances the benefits of component sharing by reducing the average backorder quantity at the expense of increased inventories, but does not improve the average kit availability.
منابع مشابه
A Robust Model for a Dynamic Cellular Manufacturing System with Production Planning
In this paper, a robust optimization approach is proposed to design a dynamic cellular manufacturing system (DCMS) under uncertainty of processing time of products. In addition, a mathematical model considering cell formation, inter-cell design and production planning under a dynamic environment (i.e., product mix and demand are changed in each period) is presented. Therefore, reconfiguration b...
متن کاملA Single Machine Capacitated Production Planning Problem Under Uncertainty: A Grey Linear Programming Approach
The production planning is an important problem in most of manufacturing systems in practice. Unlike many researches existing in literature, this problem encounters with great uncertainties in parameters and input data. In this paper, a single machine capacitated production planning problem is considered and a linear programming formulation is presented. The production costs are assumed to be u...
متن کاملA Stochastic Programming Approach for a Multi-Site Supply Chain Planning in Textile and Apparel Industry under Demand Uncertainty
In this study, a new stochastic model is proposed to deal with a multi-product, multi-period, multi-stage, multi-site production and transportation supply chain planning problem under demand uncertainty. A two-stage stochastic linear programming approach is used to maximize the expected profit. Decisions such as the production amount, the inventory level of finished and semi-finished product, t...
متن کاملDetermining production level under uncertainty using fuzzy simulation and bootstrap technique, a case study
In every production plant, it is necessary to have an estimation of production level. Sometimes there are many parameters affective in this estimation. In this paper, it tried to find an appropriate estimation of production level for an industrial factory called Barez in an uncertain environment. We have considered a part of production line, which has different production time for different kin...
متن کاملResilient Decision Making in Open Pit Short-term Production Planning in Presence of Geologic Uncertainty
Short-term production plans are the basis for operational mine production schedules. They concentrate on making long-term mine plans operationally feasible. Furthermore, some variables such as ore grade and tonnage govern mine production systems and cause uncertainty in the supply of raw materials to the mills. Due to the quality variation of material, short-term production optimization is an u...
متن کامل