Estimating the Mean and Variance of Activity Duration in PERT

نویسندگان

  • N. Ravi Shankar
  • K. Surya Narayana Rao
  • V. Sireesha
  • Ravi Shankar
چکیده

The traditional PERT (Program Evaluation and Review Technique) model uses beta distribution as the distribution of activity duration and estimates the mean and the variance of activity duration using “pessimistic”, “most likely” and “optimistic” time estimates proposed by an expert. In the past several authors have modified the original PERT estimators to improve the accuracy. In this paper, on the basis of the study of the PERT assumptions, we present an improvement of these estimates. At the end of the paper, an example is presented to compare with those obtained using the proposed method as well as other method. The comparisons reveal that the method proposed in this paper is more effective in determining the activity criticalities and finding the critical path.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Combination of Approximation and Simulation Approaches for Distribution Functions in Stochastic Networks

This paper deals with the fundamental problem of estimating the distribution function (df) of the duration of the longest path in the stochastic activity network such as PERT network. First a technique is introduced to reduce variance in Conditional Monte Carlo Sampling (CMCS). Second, based on this technique a new procedure is developed for CMCS. Third, a combined approach of simulation and ap...

متن کامل

An Approximation for the Activity Duration Distribution, Supporting Original PERT

The Program Evaluation and Review Technique (PERT) has been widely used as a tool for project management. In PERT analysis the activity time distribution is assumed to be a beta distribution, and the mean and variance of the activity time are estimated. The activity mean and variance are very useful to find the expected project duration and variance of the critical path. By generalizing the ass...

متن کامل

Expected Duration of Dynamic Markov PERT Networks

Abstract : In this paper , we apply the stochastic dynamic programming to approximate the mean project completion time in dynamic Markov PERT networks. It is assumed that the activity durations are independent random variables with exponential distributions, but some social and economical problems influence the mean of activity durations. It is also assumed that the social problems evolve in ac...

متن کامل

Bicriteria Resource Allocation Problem in Pert Networks

We develop a bicriteria model for the resource allocation problem in PERT networks, in which the total direct costs of the project as the first objective, and the mean of project completion time as the second objective are minimized. The activity durations are assumed to be independent random variables with either exponential or Erlang distributions, in which the mean of each activity duration ...

متن کامل

Revisiting the PERT mean and variance

Difficulties with the interpretation of the parameters of the beta distribution let Malcolm et al. (1959) to suggest in the Program Evaluation and Review Technique (PERT) their by now classical expressions for the mean and variance for activity completion for practical applications. In this note, we shall provide an alternative for the PERT variance expression addressing a concern raised by Hah...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010