Scheduling in semiconductor manufacturing is a challenging task due to inherent complexities like assignment of multiple customer orders to front opening unified pods (FOUPs), batch processing in multiple toolgroups with parallel machines, and re-entrant flow. A disjunctive–network-flow mixed integer program (DNF) and a column generation heuristic are presented to minimize the sum of weighted customer order completion times in a complex job shop environment. In addition, a lower bound estimation approach for the complex job shop problem is presented. The column generation heuristic obtains solutions that are very close to that of the time constrained DNF formulation for problem instances with zero order ready times. However, column generation’s performance differs considerably for problem instances with non-zero order ready times and is able to solve large problem instances in a matter of minutes. 2009 Elsevier Ltd. All rights reserved.
منابع مشابه
Customer Order Scheduling with Job-Based Processing and Lot Streaming In A Two-Machine Flow Shop
This paper considers a customer order scheduling (COS) problem in which each customer requests a variety of products processed in a two-machine flow shop. A sequence-independent attached setup for each machine is needed before processing each product lot. We assume that customer orders are satisfied by the job-based processing approach in which the same products from different customer orders f...
متن کاملPareto- Front Generation by Classical and Meta-heuristic Methods in Flexible Job Shop Scheduling with Multiple ObjectivesPareto- Front Generation by Classical and Meta-heuristic Methods in Flexible Job Shop Scheduling with Multiple Objectives
Planning and scheduling are as decision making processes which they have important roles in production systems and industries. According that, job shop scheduling is one of NPhard problems to solve multi-objective decision making approaches. So, the problem is known as uncertain with many variables in optimal solution view. Finding optimal solutions are essential task in scheduling of jobs betw...
متن کاملComplex Job-Shop Scheduling for Semiconductor Manufacturing: A Batch-Oblivious Heuristic
Scheduling decisions in the diffusion and cleaning area can be crucial for the overall performance of a semiconductor manufacturing facility. This area includes complex production constraints and long processing durations. Consequently, we want to optimize scheduling decisions in this area while taking all relevant real-world constraints into account. An important property of machines in this w...
متن کاملA time-indexed LP-based approach for min-sum job-shop problems
In this paper we propose two time-indexed IP formulations for job-shop scheduling problems with a min-sum objective. The first model has variables associated to job scheduling patterns. The exponential number of variables calls for a column generation scheme which is carried out by a dynamic programming procedure. The second model is of network flow type with side constraints. This model can be...
متن کاملAn Improved Tabu Search Algorithm for Job Shop Scheduling Problem Trough Hybrid Solution Representations
Job shop scheduling problem (JSP) is an attractive field for researchers and production managers since it is a famous problem in many industries and a complex problem for researchers. Due to NP-hardness property of this problem, many meta-heuristics are developed to solve it. Solution representation (solution seed) is an important element for any meta-heuristic algorithm. Therefore, many resear...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Computers & Industrial Engineering
دوره 58 شماره
صفحات -
تاریخ انتشار 2010