Stochastic Modeling of a Computer System with Priority to PM over S/W Replacement Subject to Maximum Operation and Repair Times
نویسندگان
چکیده
This paper focuses on the stochastic modeling of a computer system of two identical unitsone is initially operative and other is kept as spare in cold standby. In each unit h/w and s/w components work together and fail independently. There is a single server who visits the system immediately as and when required. The server takes the unit under preventive maintenance after a maximum operation time at normal mode. The h/w components under go for repair at their failure and are replaced by new one in case these are not repaired up to a maximum repair time. However, s/w components are replaced by new one instead of repair. Priority is given to the preventive maintenance (PM) of the unit over replacement of the s/w components. The failure time distribution of the components follow negative exponential whereas the distributions of preventive maintenance, repair and replacement time are taken as arbitrary with different probability density functions. Several reliability and economic indices have been obtained using semi-Markov and regenerative point technique. The graphical study of the results has also been made.
منابع مشابه
Cost-Benefit Analysis of a Computer System with Priority to S/W Replacement over H/W Repair Activities Subject to Maximum Operation and Repair Times
The emphasis of the present study is on the evaluation of reliability measures of a computer system with independent hardware (h/w) and software (s/w) failures. A single repair facility is provided immediately for conducting repair activities of h/w and s/w. Preventive maintenance of the system is done after a maximum operation time. Replacement of the h/w by new one is made in case server fail...
متن کاملStochastic Modeling of a System with Priority for Operation to New Unit and Preventive Maintenance at Pfs Subject to Mot
A stochastic model for a cold standby system of two identical units is developed in which unit fails completely either directly from normal mode or via partial failure. The unit undergoes preventive maintenance (PM) after a maximum operation time (MOT) at its partial failure stage (PFS). There is a single server who visits the system immediately as and when needed to do preventive maintenance a...
متن کاملA Parallel System with Priority to Preventive Maintenance over Repair Subject to Maximum Operation and Repair Times
Abstract In this work, a stress is given on the evaluation of performance measures of a parallel system under priority with necessary conditions on operation and repair times. The units are identical in nature subject to constant failure. There is a single server who visits the system immediately to rectify the faults whenever occurred in the system. The system undergoes for preventive maintena...
متن کاملA multi-stage stochastic programming for condition-based maintenance with proportional hazards model
Condition-Based Maintenance (CBM) optimization using Proportional Hazards Model (PHM) is a kind of maintenance optimization problem in which inspections of a system relevant to its failure rate depending on the age and value of covariates are performed in time intervals. The general approach for constructing a CBM based on PHM for a system is to minimize a long run average cost per unit of time...
متن کاملProbabilistic Analysis of a Computer System with Inspection and Priority for Repair Activities of H/W over Replacement of S/W
The main aim of this paper is to carry out the probabilistic analysis of a computer system of two identical units in which one is operative and the other is in cold standby. In each unit h/w and s/w components fail independently and work together. A server visits the system immediately to inspect the h/w components at their failure to see the feasibility of repair. If repair of the h/w is not f...
متن کامل