Agent-based hierarchical production planning and scheduling in make-to-order manufacturing system

نویسندگان

  • N. He
  • D. Z. Zhang
  • Q. Li
چکیده

Nowadays, manufacturing organisations face increasing pressures from the frequent change in product type, continuous demand fluctuation and unexpected change in customer requirements. In order to survive in the turbulent environment, manufacturing organisations must become flexible and responsive to these dynamic changes in the business environment. This paper presents a hierarchical agent bidding mechanism that is particularly designed for Make-to-Order manufacturing system and attempts to enhance the operational flexibility of manufacturing system in dealing with dynamic changes in the business environment. The novelty of this mechanism is that it enables manufacturing resources to be self-organised cost-efficiently within structural constraints of manufacturing system for fulfilling customer orders. However, when orders cannot be fulfilled within the structural constraints of manufacturing systems, the mechanism can enable manufacturing resources to be regrouped flexibly across system boundaries but with minimum disturbances to existing system structure. Based on an example application to a manufacturing company, this paper demonstrates that the operational flexibility provided by this mechanism is able to help manufacturing system to respond demand fluctuation through balancing the capacity across the entire system. Meanwhile, this mechanism potentially enables manufacturing systems to deal with unexpected changes in product type. As long as the manufacturing system has the technicality required by a new product, this mechanism enables resources across the manufacturing system to be cost-efficiently and flexibly self-organised to fulfil the

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Hierarchical Production Planning and Finite Scheduling Framework for Part Families in Flexible Job-shop (with a case study)

Tendency to optimization in last decades has resulted in creating multi-product manufacturing systems. Production planning in such systems is difficult, because optimal production volume that is calculated must be consistent with limitation of production system. Hence, integration has been proposed to decide about these problems concurrently. Main problem in integration is how we can relate pro...

متن کامل

An improved genetic algorithm for multidimensional optimization of precedence-constrained production planning and scheduling

Integration of production planning and scheduling is a class of problems commonly found in manufacturing industry. This class of problems associated with precedence constraint has been previously modeled and optimized by the authors, in which, it requires a multidimensional optimization at the same time: what to make, how many to make, where to make and the order to make. It is a combinatorial,...

متن کامل

Strategic Choice of Manufacturing Planning and Control Approaches: Empirical Analysis of Drivers and Performance

The design of manufacturing planning and control systems is a strategic decision for manufacturing firms. In this paper we analyze the interrelationships among the choices of planning and control approaches at different hierarchical levels, including sales and operations planning (chase; level), master scheduling (make-to-order; assemble-to-order; make-to-stock), material planning (time-phased;...

متن کامل

A cloud-based simulated annealing algorithm for order acceptance problem with weighted tardiness penalties in permutation flow shop scheduling

Make-to-order is a production strategy in which manufacturing starts only after a customer's order is received; in other words, it is a pull-type supply chain operation since manufacturing is carried out as soon as the demand is confirmed. This paper studies the order acceptance problem with weighted tardiness penalties in permutation flow shop scheduling with MTO production strategy, the objec...

متن کامل

Human resources scheduling based on machines maintenance planning and human reliability level

In today's competitive market, quality has an important role in manufacturing system. The manufacturers attempt to maintain their production system in a proper condition to produce high quality products. One of the key factors to achieve this goal is maintenance policy. Most studies on maintenance focused on machines and less attention has been paid to human resources as the most important fact...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2015