Selection of road project portfolios

نویسندگان

  • Arne Løkketangen
  • James Odeck
  • David L. Woodruff
چکیده

We describe a real-world problem from the road sector in Norway. Every four years the Norwegian Public Roads Administration (NPRA) have to select which road development projects to do the next four years. This portfolio of projects has to be selected from a much larger set of worthy projects. Todays practice in evaluating individual road projects is based on the well known cost-benefit analysis (CBA), which in our case measures the increased benefit for the society if the project is implemented. This benefit is measured in Norwegian kroner. There are many components that enter into the CBA, and not all of them are easily or naturally converted into kroner. Examples are reduction in noise level or geographic spread of the selected projects, and the effect of extra focus on these aspect should be emphasized for the decision maker. This as a multi-criteria optimization problem, where some of criteria are naturally represented as money or other scalars, and others are more naturally on an ordinal scale, using rank-based ordering. We use a tabu-search based multicriteria metaheuristic to solve this problem. This heuristic will generate a plethoria of solutions along the efficient frontier. We therefore incorporate novel ways to calculate the distance (in the solution space) between solutions, so that the user (decision maker) only is presented with sufficiently different portfolios to choose between. We will use real data from the project data base at NPRA, and compare our methods with todays practice.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A MULTI-OBJECTIVE OPTIMIZATION MODEL FOR PROJECT PORTFOLIO SELECTION CONSIDERING AGGREGATE COMPLEXITY: A CASE STUDY

Existing project selection models do not consider the complexity of projects as a selection criterion, while their complexity may prolong the project duration and even result in its failure. In addition, existing models cannot formulate the aggregate complexity of the selected projects. The aggregated complexity is not always equal to summation of complexity of projects because of possible syne...

متن کامل

Robust Portfolio Optimization in Multi-Criteria Project Selection

Selection of a project portfolio with limited resources is an important decision in both public and industrial organizations. Often these decisions are complicated by a high number of project proposals, considerations of multiple criteria and resources, project interactions, uncertain project outcomes and incomplete information about decision maker's (DM's) preferences. Moreover, opportunity co...

متن کامل

Preference programming for robust portfolio modeling and project selection

In decision analysis, difficulties of obtaining complete information about model parameters make it advisable to seek robust solutions that perform reasonably well across the full range of feasible parameter values. In this paper, we develop the Robust Portfolio Modeling (RPM) methodology which extends Preference Programming methods into portfolio problems where a subset of project proposals ar...

متن کامل

A Methodology for R&D Portfolio Selection: Employing an Integrated DEA and BSC Model

We present a portfolio selection methodology that responds to three major goals that most R&D organizations are concerned with – effectiveness, efficiency, and balance. The methodology uses a strategy-oriented, multi-criterion, evaluation model that integrates concepts from data envelopment analysis (DEA) and balanced scorecard (BSC). It is based on two subsequent phases. At the first phase ind...

متن کامل

Multi-period project portfolio selection under risk considerations and stochastic income

This paper deals with multi-period project portfolio selection problem. In this problem, the available budget is invested on the best portfolio of projects in each period such that the net profit is maximized. We also consider more realistic assumptions to cover wider range of applications than those reported in previous studies. A novel mathematical model is presented to solve the problem, con...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2002