An integrated system for duration estimation in design/build projects and organizations

نویسنده

  • Alaattin Kanoglu
چکیده

Overruns to planned schedules are common in civil construction projects worldwide. Yet, the construction industry fails to recognize the criticality of the problem; and whilst models have been developed, their lack of adequate sophistication fails to alleviate the problem. Additionally, there is resistance from construction professionals to use such models due to the lack of software integration models and modular functionality. This paper presents a performance-based duration estimation model integrated with an automation system model, MITOS Multi-phase Integrated Automation System, that was designed primarily for design/build firms. An experience-based computational model is used for the estimation of the duration of construction projects and the performance results are discussed.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Design and Experimental Evaluation of integrated orientation estimation algorithm Autonomous Underwater Vehicle Based on Indirect Complementary Filter

This paper aims is to design an integrated navigation system constituted by low-cost inertial sensors to estimate the orientation of an Autonomous Underwater Vehicle (AUV) during all phases of under water and surface missions. The proposed approach relied on global positioning system, inertial measurement unit (accelerometer & rate gyro), magnetometer and complementary filter technique. Complem...

متن کامل

A Model-Driven Decision Support System for Software Cost Estimation (Case Study: Projects in NASA60 Dataset)

Estimating the costs of software development is one of the most important activities in software project management. Inaccuracies in such estimates may cause irreparable loss. A low estimate of the cost of projects will result in failure on delivery on time and indicates the inefficiency of the software development team. On the other hand, high estimates of resources and costs for a project wil...

متن کامل

Comparative analysis of design/build and design/bid/build project delivery systems in Lebanon

Design/bid/build and design/build are two principal project delivery systems used worldwide. The performance of each project may differ with the type of procurement system used. This study has two aims: firstly, to assess and compare the performance of design/bid/build and design/build projects in Lebanon; secondly, to compare the results with the performance of equivalent systems in the Far Ea...

متن کامل

Achieving Integrated Care for Older People: What Kind of Ship?; Comment on “Achieving Integrated Care for Older People: Shuffling the Deckchairs or Making the System Watertight for the Future?”

This paper considers an implication of the idea that proposals for integrated care for older people should start from a focus on the patient, consider co-production solutions to the problems of care fragmentation, and be at a system-wide, cross-organisational level. It follows that the analysis, design and therefore evaluation of integrated care projects should be based upon the journeys which ...

متن کامل

Design of Computer Integrated Manufacturing System for Irankhodro Auto Industry

Computer-integrated manufacturing (CIM), technologies are presented as solutions to manufacturing organizations, which need to perform well in all customer-related dimensions simultaneously. In the literature, CIM technologies providing such benefits as more frequent production changes, reduced inventory level, improved ability of producing complex parts with a high degree of accuracy and repea...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2004