A case study
نویسنده
چکیده
This paper describes an actual aircraft maintenance labor scheduling study. The study's objective is to determine the optimum maintenance workforce schedule to satisfy growing labor requirements with minimum cost. The main recommendation of the study is to switch from a five-day to a seven-day workweek for aircraft maintenance workers. A new integer programming formulation, used to obtain an optimum seven-day work schedule with no increase in workforce size, is presented. In comparison to the existing five-day schedule, switching to a seven-day workweek is expected to produce savings of about 13 per cent, or $100,000 annually.
منابع مشابه
Familial risk of acne vulgaris in 8-13 year-old females: A case-control study
Background: Acne vulgaris has a multifactorial pathogenesis; however, the exact role of genetic predisposition is not clear. Some studies have reported an association between familiy historyof acne and moderate to severe acne. In this study, we investigated the relationship between familiy history and prevalence of acne vulgaris in girls 8 to 13 years of age.Methods: This case-control study enr...
متن کاملHyperamylasemia in a Patient with Uncomplicated Appendicitis: A Case Report
Background and Objectives: Today, in addition to the acute pancreatitis, hyperamylasemia is seen among some other acute surgical conditions. Therefore, the aim of this study was to introduce a case of hyperamylasemia as a rare case in a patient with uncomplicated appendicitis. Case report: The present study was a case report in which a 10-year-old patient referred to Ali-ebn Abi Taleb Hospita...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 1999