Some heuristics for the hybrid flow shop scheduling problem with setup and assembly operations

نویسندگان

  • M. H. Hosseini
  • Seyed Mohammad Hassan Hosseini
  • Fariborz Jolai
چکیده

Article history: Received January 2 2013 Received in revised format March 14 2013 Accepted March 14 2013 Available online March 15 2013 This paper presents a two-stage hybrid flow shop scheduling problem with setup and assembly operations. The proposed study of this paper considers one kind of product with a quantity of demand where each product is made by assembling a set of different parts. At first, the parts are manufactured in a two-stage hybrid flow-shop and then the parts are assembled into products on assembly stage. Setup operations are needed when a machine starts processing the parts or it changes items. The considered objective is minimizing the completion time of all products. Since the problem is classified as NP-hard class, a combinatorial algorithm is proposed. The proposed algorithm is a three-step procedure where we use heuristic, genetic algorithm (GA), simulated annealing (SA), NEH and Johnson’s algorithm. Three lower bounds are presented and improved to evaluate the proposed algorithms. An extensive computational experiment is conducted to compare the performances of the proposed algorithms. © 2013 Growing Science Ltd. All rights reserved

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A novel hybrid genetic algorithm to solve the make-to-order sequence-dependent flow-shop scheduling problem

Flow-shop scheduling problem (FSP) deals with the scheduling of a set of n jobs that visit a set of m machines in the same order. As the FSP is NP-hard, there is no efficient algorithm to reach the optimal solution of the problem. To minimize the holding, delay and setup costs of large permutation flow-shop scheduling problems with sequence-dependent setup times on each machine, this pap...

متن کامل

A comparison of algorithms for minimizing the sum of earliness and tardiness in hybrid flow-shop scheduling problem with unrelated parallel machines and sequence-dependent setup times

In this paper, the flow-shop scheduling problem with unrelated parallel machines at each stage as well as sequence-dependent setup times under minimization of the sum of earliness and tardiness are studied. The processing times, setup times and due-dates are known in advance. To solve the problem, we introduce a hybrid memetic algorithm as well as a particle swarm optimization algorithm combine...

متن کامل

Modeling the Hybrid Flow Shop Scheduling Problem Followed by an Assembly Stage Considering Aging Effects and Preventive Maintenance Activities

Scheduling problem for the hybrid flow shop scheduling problem (HFSP) followed by an assembly stage considering aging effects additional preventive and maintenance activities is studied in this paper. In this production system, a number of products of different kinds are produced. Each product is assembled with a set of several parts. The first stage is a hybrid flow shop to produce parts. All ...

متن کامل

Improved teaching–learning-based and JAYA optimization algorithms for solving flexible flow shop scheduling problems

Flexible flow shop (or a hybrid flow shop) scheduling problem is an extension of classical flow shop scheduling problem. In a simple flow shop configuration, a job having ‘g’ operations is performed on ‘g’ operation centres (stages) with each stage having only one machine. If any stage contains more than one machine for providing alternate processing facility, then the problem...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013