Transportation problem with plant closure and relocation of machines
نویسندگان
چکیده
This paper is interested in a food industrial group which produces large quantities of sugar and distributes it to warehouses and customers. The group should review its distribution policy, in particular, to optimize transportation costs and reduce losses caused by the current organization. In this paper, we propose an integer linear model to optimize the travel of full loaded trucks taking into account respect of the group’s peculiarities. We study a second integer linear model taking into account transportation and production costs and allowing the possibility of closing some plants. Finally, the last model aims to review the production capacity of each plant through a redeployment of its production lines.
منابع مشابه
Mathematical Modeling for a Flexible Manufacturing Scheduling Problem in an Intelligent Transportation System
This paper presents a new mathematical model for a production system through a scheduling problem considering a material handling system as an intelligent transportation system by automated guided vehicles (AGVs). The traditional systems cannot respond to the changes and customer’s demands and for this reason, a flexible production system is used. Therefore, for this purpose, automated transpor...
متن کاملNew Heuristic Algorithm for Flow Shop Scheduling with 3 Machines and 2 Robots Considering the Breakdown Interval of Machines and Robots Simultaneously
Scheduling is an important subject of production and operations management area. In flow-shop scheduling, the objective is to obtain a sequence of jobs which when processed in a fixed order of machines, will optimize some well defined criteria. The concept of transportation time is very important in scheduling. Transportation can be done by robots. In situations that robots are used to transpor...
متن کاملFinite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups
This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....
متن کاملRouting and Production Scheduling for a Mobile Factory
In last decades, mobile factories have been used due to their high production capability, carrying their equipment and covering rough and uneven routes. Nowadays, more companies use mobile factories with the aim of reducing the transportation and manufacturing costs. The mobile factory must travel between the suppliers, visit all of them in each time period and return to the initial location of...
متن کاملRobust optimization of a mathematical model to design a dynamic cell formation problem considering labor utilization
Cell formation (CF) problem is one of the most important decision problems in designing a cellular manufacturing system includes grouping machines into machine cells and parts into part families. Several factors should be considered in a cell formation problem. In this work, robust optimization of a mathematical model of a dynamic cell formation problem integrating CF, production planning and w...
متن کامل