Project Management Patterns to Prevent Schedule Delay Caused by Requirements Changes - Empirical Study on a Successful Project

نویسندگان

  • Shouzo Hori
  • Takako Nakatani
  • Keiichi Katamine
  • Naoyasu Ubayashi
  • Masaaki Hashimoto
چکیده

We propose PM (Project Management) patterns in order to prevent schedule delays caused by requirements changes on empirical studies. Changes or late elicitation of requirements during the design, coding and test processes are one of the most serious risks, which may delay the project schedules. However, changes and late elicitation of requirements are sometimes inevitably accepted during the development processes. Therefore, the PM method for preventing schedule delays caused by changes and late elicitation of requirements during the development processes should be studied. In this study, we examined the actual conditions of a project. The project succeeded in preventing schedule delays, though it did accept changes and late elicitation of requirements during the development processes. As a result, we were able to extract various typical PM techniques for preventing schedule delays caused by requirements elicitation. The techniques were also applied to other projects. Thus, we call them “PM patterns”. Moreover, we’ve arranged the patterns on a two-dimensional framework. The first dimension is a set of nine knowledge areas of PM such as scope, time and cost management. The second dimension is a group of PM processes such as planning, executing and controlling processes. We also break down the project goal, in this case, the redevelopment of systems for future modifiability, into issues such as keeping lead time and educating engineers, and arrange them on the framework. Then, we discuss the relationship between the project goal and PM patterns on the framework.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A COMPARATIVE MODEL OF EVM AND PROJECT’S SCHEDULE RISK ANALYSIS USING MONTE CARLO SIMULATION

<span style="color: #000000; font-family: Tahoma, sans-serif; font-size: 13px; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: auto; text-align: justify; text-indent: 0px; text-transform: none; white-space: normal; widows: auto; word-spacing: 0px; -webkit-text-stroke-width: 0px; display: inline !important; float: none; backgro...

متن کامل

A COMPARATIVE MODEL OF EVM AND PROJECT’S SCHEDULE RISK ANALYSIS USING MONTE CARLO SIMULATION

<span style="color: #000000; font-family: Tahoma, sans-serif; font-size: 13px; font-style: normal; font-variant: normal; font-weight: normal; letter-spacing: normal; line-height: normal; orphans: auto; text-align: justify; text-indent: 0px; text-transform: none; white-space: normal; widows: auto; word-spacing: 0px; -webkit-text-stroke-width: 0px; display: inline !important; float: none; backgro...

متن کامل

An Extension of the Earned Value Management to Improve the Accuracy of Schedule Analysis Results

A project is any endeavor involving planned action, for example, developing a new product or constructing a dam. [CE1] Major factors for a project to be successful are applying performance measurement and feedback tool. One such well-known performance measurement tool to control the project execution is earned value management (EVM). EVM uses the fundamental principle that trends in the past ca...

متن کامل

A Multi-objective optimization model for project scheduling with time-varying resource requirements and capacities

Proper and realistic scheduling is an important factor of success for every project. In reality, project scheduling often involves several objectives that must be realized simultaneously, and faces numerous uncertainties that may undermine the integrity of the devised schedule. Thus, the manner of dealing with such uncertainties is of particular importance for effective planning. A realistic sc...

متن کامل

Development of a forward chain approach for calculating self-delay of project activities

In the field of management, the delay within projects is a prominent and contentious issue. Due to the fact that delay leads to cost and time over-runs, it is often the subject of litigation claims and creation of managerial tensions. In a bid to bring such delays under control and also to diminish managerial tensions, it is necessary to recognize and understand the following four concepts:"typ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2009