Using Structural Equation Modelling to Assess Effects of Construction Resource Related Factors on Cost Overrun
نویسندگان
چکیده
Cost performance is the basic criteria for measuring success of any project. Since construction projects are highly dependable on resources, construction cost is significantly affected by various resource related factors. Compared to traditional methods of data analysis, Structural Equation Model (SEM) is the graphical equivalent of a mathematical representation to study relationship between dependant variable to explanatory variable. SEM is regarded as extension of standardized regression modelling and is important tool to estimate the causal relationship between factors. SEM functionality is better than other multivariate techniques including multiple regression, path analysis and factor analysis in analyzing the cause–effect relations between latent constructs. Since no study has estimated causal relations among resource factors and cost performance yet, hence this study adopted structural equation modelling to assess the effects of the resource related factors on project cost in the southern part of peninsular Malaysia. With 20 resource-related factor identified from literature, a theoretical model demonstrated how construction resources affect cost overrun. The model is tested using structural equation modelling technique with Partial Least Square (PLS) approach to SEM as PLS is dominant approach to establish rigor in complex models. A total of 159 data samples collected via structured questionnaire survey were used for estimation. Model estimation was carried out using SmartPLS 2.0 software. Results showed that approximately 47% of cost overrun was influence with resource related factors. Global Fit Index (GoF) value of the developed model is 0.517, indicating that the model has enough explaining power to generalize the phenomenon of Malaysian construction industry. Money (finance) related factors were found as most dominant factors causing cost overrun. The authors conclude that effective financial management can significantly improve the projects success and help in reducing the cost overrun.
منابع مشابه
Path analysis of occupational injuries based on the structural equation modeling approach: a retrospective study in the construction industry
Background and aims: The construction industry, sites, and projects are the most dangerous industries in terms of the risk of occupational accidents and injuries. Important factors that have led the industry as a health, safety, environment (HSE) high-risk industry in the world can be cited such as continuous changes in construction projects, using a lot of resources, poor working conditions,...
متن کاملSEM-PLS Analysis of Inhibiting Factors of Cost Performance for Large Construction Projects in Malaysia: Perspective of Clients and Consultants
This study uncovered inhibiting factors to cost performance in large construction projects of Malaysia. Questionnaire survey was conducted among clients and consultants involved in large construction projects. In the questionnaire, a total of 35 inhibiting factors grouped in 7 categories were presented to the respondents for rating significant level of each factor. A total of 300 questionnaire ...
متن کاملAbility Mediation Effects in the Relationships between Human Resource Practices and Service Quality
In this study, the relationships between Human Resource Practices (HRPs), firm performance (service quality), and the mediation effects of employees’ abilities were examined. To assess the relationships between variables, before evaluating the fitted structural model, the measurement model was defined to verify that the measurement variables used to reflect the unobserved constructs do so in a ...
متن کاملInvestigation of Socio-Economic and Environmental Effects of Taleghan Dam Using Structural Equation Modeling
Today water supply issue in large cities seems to be a big problem. This becomes more important with population growth and urbanization extension. To cope with this problem lots of irrigation and drainage projects have been implemented and operated that subsequently many socio- economic and cultural effects have been brought to the areas . The objective of the present study is to survey the soc...
متن کاملAnalysis of Cost Overrun in Highway Construction Projects Using Multiple Regression and Artificial Neural Networks
Cost overruns are more common in infrastructure projects especially, more common in road construction activities. There existed a need to develop a probabilistic cost overrun analysis model in construction projects as a decision support tool for contractors before the bidding stage. The objective of this study is to identify the critical factors affecting cost overrun and obtain statistical mod...
متن کامل