Scheduling of Mechanics in Automobile Repair Shops Using Ann

نویسنده

  • N. SHIVASANKARAN
چکیده

Scheduling problems are NP – Hard combinatorial optimization problems, since many algorithms have been developed which offers new promising insights for solving resource allocation problems. Considering the problems faced in automobile repair shops, who sets the customer due dates of the car based on processing time, jobs already waiting for processing and mechanic available time. Also the workload of the mechanic should be balanced and minimize the make-span of the work. So this paper is concerned with determination of optimal allocation of repair jobs to the mechanic using Artificial Neural Network and hence to determine the minimum Total cost and make span of repair.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Modeling and scheduling no-idle hybrid flow shop problems

Although several papers have studied no-idle scheduling problems, they all focus on flow shops, assuming one processor at each working stage. But, companies commonly extend to hybrid flow shops by duplicating machines in parallel in stages. This paper considers the problem of scheduling no-idle hybrid flow shops. A mixed integer linear programming model is first developed to mathematically form...

متن کامل

No-idle time Scheduling of Open shops: Modeling and Meta-heuristic Solution Methods

In some industries as foundries, it is not technically feasible to interrupt a processor between jobs. This restriction gives rise to a scheduling problem called no-idle scheduling. This paper deals with scheduling of no-idle open shops to minimize maximum completion time of jobs, called makespan. The problem is first mathematically formulated by three different mixed integer linear programming...

متن کامل

Economic Lot Sizing and Scheduling in Distributed Permutation Flow Shops

This paper addresses a new mixed integer nonlinear and linear mathematical programming economic lot sizing and scheduling problem in distributed permutation flow shop problem with number of identical factories and machines. Different products must be distributed between the factories and then assignment of products to factories and sequencing of the products assigned to each factory has to be d...

متن کامل

Creation and Usability Evaluating of E-Learning Contents for Automobile Repair Block Painting

Due to the fact that paintwork in the automobile repair industry requires individual correspondence, work by human hands is indispensable. Although the skills of expert engineers have a great influence on the finish, learning these skills require a lot of experience and time. In Japan, the number of young people in the automobile mechanic and automobile repair industry is drastically decreasing...

متن کامل

Exposure to lead, cadmium and chromium among spray painters in automobile body repair shops.

Environmental and biological monitoring of lead, cadmium and chromium levels in spray painters is reported. All of the study subjects worked in automobile body repair shops that had no standard spraying room. They were divided into 2 groups, those who wore an aerosol-removing respirator while spraying (n=20) and those who did not wear the respirator (n=50). Air in the breathing zone of each sub...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2014