To appear, European Journal of Operational Research. Case Study on Statistically Estimating Minimum Makespan for Flow Line Scheduling Problems
نویسندگان
چکیده
Lower bounds are typically used to evaluate the performance of heuristics for solving combinatorial minimization problems. In the absence of tight analytical lower bounds, optimal objective-function values may be estimated statistically. In this paper, extreme value theory is used to construct confidence-interval estimates of the minimum makespan achievable when scheduling nonsimilar groups of jobs on a two-stage flow line. Experimental results based on randomly sampled solutions to each of 180 randomly generated test problems revealed that (i) least-squares parameter estimators outperformed standard analytical estimators for the Weibull approximation to the distribution of the sample minimum makespan; (ii) to evaluate each Weibull fit reliably, both the Anderson-Darling and Kolmogorov-Smirnov goodness-of-fit tests should be used; and (iii) applying a local improvement procedure to a large sample of randomly generated initial solutions improved the probability that the resulting Weibull fit yielded a confidence interval covering the minimum makespan.
منابع مشابه
Case study on statistically estimating minimum makespan for flow line scheduling problems
Lower bounds are typically used to evaluate the performance of heuristics for solving combinatorial minimization problems. In the absence of tight analytical lower bounds, optimal objective-function values may be estimated statistically. In this paper, extreme value theory is used to construct confidence-interval estimates of the minimum makespan achievable when scheduling nonsimilar groups of ...
متن کاملFast approximation schemes for Boolean programming and scheduling problems related to positive convex Half-Product
We address a version of the Half-Product Problem and its restricted variant with a linear knapsack constraint. For these minimization problems of Boolean programming, we focus on the development of fully polynomial-time approximation schemes with running times that depend quadratically on the number of variables. Applications to various single machine scheduling problems are reported: minimizin...
متن کاملA novel mathematical model for a hybrid flow shop scheduling problem under buffer and resource limitations-A case study
Scheduling problems play a big role in manufacturing and planning the production for increasing the production efficiency and assigning the resources to operations. Furthermore, in many manufacturing systems there is a physical space between stages that called intermediate buffers. In this study, a model is proposed for minimizing the makespan of a hybrid flow shop scheduling problem with inter...
متن کاملApproximation algorithms for the parallel flow shop problem
We consider the NP-hard problem of scheduling n jobs in m two-stage parallel flow shops so as to minimize the makespan. This problem decomposes into two subproblems: assigning the jobs to parallel flow shops; and scheduling the jobs assigned to the same flow shop by use of Johnson’s rule. For m = 2, we present a 32 -approximation algorithm, and for m = 3, we present a 12 7 -approximation algori...
متن کاملMeta heuristic for Minimizing Makespan in a Flow-line Manufacturing Cell with Sequence Dependent Family Setup Times
This paper presents a new mathematical model for the problem of scheduling part families and jobs within each part family in a flow line manufacturing cell where the setup times for each family are sequence dependent and it is desired to minimize the maximum completion time of the last job on the last machine (makespan) while processing parts (jobs) in each family together. Gaining an optimal s...
متن کامل