Improving performance with sophisticated master production scheduling
نویسندگان
چکیده
Literature addressing master production scheduling (MPS) typically focuses on the development of sophisticated MPS methods with the expectation that these methods will result in feasible plans and improved performance. However, empirical evidence showing that sophisticated methods are better than simpler ones remains scarce, and companies have reported difficulties with using sophisticated planning methods. In this study, we therefore investigate how sophisticated MPS methods impact three perception-based performance variables—namely, plan feasibility, inventory turnover rate, and delivery service—while accounting for the complexities of planning environments and MPS maturity. We define six MPS methods, ranging from those that ignore capacity to those exhibiting capacity-constrained planning using optimisation. An analysis of survey data from a sample of Swedish manufacturing companies reveals a significant negative effect of less sophisticated methods compared to highly sophisticated ones in terms of plan feasibility, as well as a significant negative effect of the simplest method in considering available capacity compared to highly sophisticated methods in terms of delivery service. The maturity of the MPS process most significantly impacts all performance measures, whereas planning environment complexity shows only a weak negative impact. Findings also indicate that both MPS process maturity and sophisticated MPS methods mediate the negative performance prompted by complex planning environments. Results thus suggest that sophisticated MPS may generally affect performance both directly and indirectly. Using sophisticated MPS methods reduces the negative effects of complex planning environments and results in more feasible plans irrespective of environment complexity and process maturity.
منابع مشابه
Impact of forecasting error on the performance of capacitated multi-item production systems
A computer model is built to simulate master production scheduling activities in a capacitated multi-item production system under demand uncertainty and a rolling time horizon. The output from the simulation is analyzed through statistical software. The results of the study show that forecasting errors have significant impacts on total cost, schedule instability and system service level, and th...
متن کاملA Nurse Scheduling Model under Real Life Constraints
Background and Objectives: In this paper, a real life nurse scheduling model is described based on the conditions in Iranian hospitals such as monthly shift rotation, consecutive morning and evening shifts and consecutive evening and night shift. Methods: The developed model considers both hospital constraints and nurses’ preferences. Hospital constraints include assigning adequate qualifie...
متن کاملA Comprehensive Study of Several Meta-Heuristic Algorithms for Open-Pit Mine Production Scheduling Problem Considering Grade Uncertainty
It is significant to discover a global optimization in the problems dealing with large dimensional scales to increase the quality of decision-making in the mining operation. It has been broadly confirmed that the long-term production scheduling (LTPS) problem performs a main role in mining projects to develop the performance regarding the obtainability of constraints, while maximizing the whole...
متن کاملStrategic Choice of Manufacturing Planning and Control Approaches: Empirical Analysis of Drivers and Performance
The design of manufacturing planning and control systems is a strategic decision for manufacturing firms. In this paper we analyze the interrelationships among the choices of planning and control approaches at different hierarchical levels, including sales and operations planning (chase; level), master scheduling (make-to-order; assemble-to-order; make-to-stock), material planning (time-phased;...
متن کاملScheduling Divisible Workloads Using the Adaptive Time Factoring Algorithm
In the past years a vast amount of work has been done in order to improve the basic scheduling algorithms for master/slave computations. One of the main results from this is that the workload of the tasks may be adapted during the execution, using either a fixed increment or decrement (e.g. based on an arithmetical or geometrical ratio) or a more sophisticated function to adapt the workload. Cu...
متن کامل