X Simpósio De Especialistas Em Planejamento Da Operação E Expansão Elétrica X Symposium of Specialists in Electric Operational and Expansion Planning

نویسنده

  • Ian A. Hiskens
چکیده

Load modelling is a perennial source of consternation. Postmortem analyses of disturbances frequently conclude that load models must be adjusted to achieve an adequate match between measured and simulated behaviour. However the development of load models that are accurate over a wide range of system conditions requires, 1) testing that is undesirable for customers, and/or 2) measurement of behaviour during infrequent disturbances. Furthermore, the stochastic nature of many loads implies load models that are accurate at one time may be inaccurate a short time later. In terms of quantitative analysis, for example matching simulations with measurements, it is absolutely clear that accurate load modelling is vitally important. But for qualitative investigations, where the aim is to assess the likelihood of a certain disturbance scenario remaining stable or causing instability, then the need for accurate load modelling is much reduced. The paper explores this conjecture through the use of trajectory sensitivity concepts. It is shown that for qualitative assessment, it is more important to know the sensitivity of behaviour to load parameters, than to precisely know the parameter values. However most power system failures are not initiated by instability, but rather by reactionary (unanticipated) protection operation. The ability to predict operation of protection devices, and hence potential protection-induced cascading failures, may be greatly affected by load model fidelity.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Ix Simpósio De Especialistas Em Planejamento Da Operação E Expansão Elétrica Ix Symposium of Specialists in Electric Operational and Expansion Planning Synchronized Phasor Measurement System: Development and Applications

This paper describes the MedFasee project aiming at the development of a phasor measurement system (PMS) prototype and its applications for monitoring and control of power systems operation. A review of the state of the art, presented in the paper, provided the starting point for the project. A PMS simulator, developed to identify functionalities and specify system components, is presented. The...

متن کامل

X Simpósio De Especialistas Em Planejamento Da Op E Expansão Elétrica X Symposium of Specialists in Electric Operati and Expansion Planning Significance of Load Modelling in Power System Dyna

ad modelling is a perennial source of consternation. Postmortem analyses of disturbance clude that load models must be adjusted to achieve an adequate match between m ulated behaviour. However the development of load models that are accurate over a w tem conditions requires, 1) testing that is undesirable for customers, and/or 2) mea aviour during infrequent disturbances. Furthermore, the stoch...

متن کامل

VII SIMPÓSIO DE ESPECIALISTAS EM PLANEJAMENTO DA OPERAÇÃO E EXPANSÃO ELÉTRICA VII SYMPOSIUM OF SPECIALISTS IN ELECTRIC OPERATIONAL AND EXPANSION PLANNING Capacity Payments and Supply Adequacy in Competitive Electricity Markets

1 This paper benefited from discussions with Dr. Ignacio PerezArriega of the Spanish Electricity Regulatory Commission who organized a workshop on the subject of capacity payment that motivated this work and from the presentations of Larry Ruff and Harry Singh at that workshop. The positions expressed in this paper,however, are the author's own views. 2 Department of IEOR, University of Califor...

متن کامل

XII SIMPÓSIO DE ESPECIALISTAS EM PLANEJAMENTO DA OPERAÇÃO E EXPANSÃO ELÉTRICA XII SYMPOSIUM OF SPECIALISTS IN ELECTRIC OPERATIONAL AND EXPANSION PLANNING Approach of Integrating Ancillary Services into a medium-term Hydro Optimization

This paper proposes a methodology to include the ability of offering secondary control in a seasonal medium-term self-scheduling of a price-taker hydro power producer with pumped storage. The methodology is based on a two-stage stochastic program. The first stage models the offering of secondary control and the second stage acts as recourse action by hourly generating power or use it for pumpin...

متن کامل

XII SIMPÓSIO DE ESPECIALISTAS EM PLANEJAMENTO DA OPERAÇÃO E EXPANSÃO ELÉTRICA XII SYMPOSIUM OF SPECIALISTS IN ELECTRIC OPERATIONAL AND EXPANSION PLANNING “The Power Nodes Modeling Framework – Modeling and Assessing the Operational Flexibility of Hydro Power Units”

A novel concept for modeling power system units and processes including dispatchable and nondispatchable generators, controllable and non-controllable loads as well as different types of storage units is presented. Operational constraints that are relevant in power system operation such as power unit ratings, power ramp-rates, conversion efficiencies, and storage capacities can readily be inclu...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2006