The Application of Lot Streaming to Assembly Job Shop under Resource Constraints

نویسندگان

  • F. T. S. Chan
  • T. C. Wong
چکیده

Assembly job shop problem (AJSP) is an extension of classical job shop problem (JSP). AJSP first starts with a JSP and appends an assembly stage after job completion. Lot Streaming (LS) technique is defined as the process of splitting lots into sub-lots such that successive operation can be overlapped. In this paper, the previous study of LS to AJSP will be extended by introducing resource constraints. To reduce the computational effort, we propose a new Genetic Algorithm (GA) approach which is the modification of the algorithm in our previous paper. A number of test problems are conducted to examine the performance of the new GA approach. Moreover, the single GA approach will be compared with a single Particle Swarm Optimization (PSO) approach. Computational results suggest that the new algorithm can outperform the previous one and the PSO approach with respect to the objective function.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Hybrid algorithms for Job shop Scheduling Problem with Lot streaming and A Parallel Assembly Stage

In this paper, a Job shop scheduling problem with a parallel assembly stage and Lot Streaming (LS) is considered for the first time in both machining and assembly stages. Lot Streaming technique is a process of splitting jobs into smaller sub-jobs such that successive operations can be overlapped. Hence, to solve job shop scheduling problem with a parallel assembly stage and lot streaming, deci...

متن کامل

A resource-constrained assembly job shop scheduling problem with Lot Streaming technique

To ensure effective shop floor production, it is vital to consider the capital investment. Among most of the operational costs, resource must be one of the critical cost components. Since each operation consumes resources, the determination of resource level is surely a strategic decision. For the first time, the application of Lot Streaming (LS) technique is extended to a Resource-Constrained ...

متن کامل

Modelling and solving the job shop scheduling Problem followed by an assembly stage considering maintenance operations and access restrictions to machines

This paper considers job shop scheduling problem followed by an assembly stage and Lot Streaming (LS). It is supposed here that a number of products have been ordered to be produced. Each product is assembled with a set of several parts. The production system includes two stages. The first stage is a job shop to produce parts. Each machine can process only one part at the same time. The second ...

متن کامل

Customer Order Scheduling with Job-Based Processing and Lot Streaming In A Two-Machine Flow Shop

This paper considers a customer order scheduling (COS) problem in which each customer requests a variety of products processed in a two-machine flow shop. A sequence-independent attached setup for each machine is needed before processing each product lot. We assume that customer orders are satisfied by the job-based processing approach in which the same products from different customer orders f...

متن کامل

Critical Path Method for Flexible Job Shop Scheduling Problem with Preemption

This paper addressed a Flexible Job shop Scheduling Problem (FJSP) with the objective of minimization of maximum completion time (Cmax) which job splitting or lot streaming is allowed. Lot streaming is an important technique that has been used widely to reduce completion time of a production system. Due to the complexity of the problem; exact optimization techniques such as branch and bound alg...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -