The permanence of the client under uncertain estimations

ثبت نشده
چکیده

To achieve the above we propose, through a numerical example, a methodology that uses in its first phase the Fuzzy-Delphi method, with a group of experts, to acomplish an estimation of the lifetime period of the client within an enterprise, expressed as a trapezoidal fuzzy number, and to get a better consensus of the previous result, as a second phase, we submit such information to another group, different from the previous ones, obtaining a reduction of the size of the interval defined by the initial trapezoidal fuzzy number.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Fuzzy Multi-Objective Linear Programming for Project Management Decision under Uncertain Environment with AHP Based Weighted Average Method

Smooth implementation and controlling conflicting goals of a project with the usage of all related resources through organization is inherently a complex task to management. At the same time deterministic models are never efficient in practical project management (PM) decision problems because the related parameters are frequently fuzzy in nature. The project execution time is a major concern o...

متن کامل

Classical Center Location Problem Under Uncertain Environment

This paper investigates the $p$-center location problem on a network in which vertex weights and distances between vertices are uncertain. The concepts of the $alpha$-$p$-center and the expected $p$-center are introduced. It is shown that the $alpha$-$p$-center and the expected $p$-center models can be transformed into corresponding deterministic models. Finally, linear time algorithms for find...

متن کامل

ROBUST RESOURCE-CONSTRAINED PROJECT SCHEDULING WITH UNCERTAIN-BUT-BOUNDED ACTIVITY DURATIONS AND CASH FLOWS I. A NEW SAMPLING-BASED HYBRID PRIMARY-SECONDARY CRITERIA APPROACH

This paper, we presents a new primary-secondary-criteria scheduling model for resource-constrained project scheduling problem (RCPSP) with uncertain activity durations (UD) and cash flows (UC). The RCPSP-UD-UC approach producing a “robust” resource-feasible schedule immunized against uncertainties in the activity durations and which is on the sampling-based scenarios may be evaluated from a cos...

متن کامل

Permanence and global asymptotic stability of a delayed predator-prey model with Hassell-Varley type functional response

Here, a predator-prey model with Hassell-Varley type functional responses is studied. Some sufficient conditions are obtained for the permanence and global asymptotic stability of the system by using comparison theorem and constructing a suitable Lyapunov functional. Moreover, an example is illustrated to verify the results by simulation.

متن کامل

Fuzzy tonnage-average grade model based on extension principle

Due to the nature of the geological and mining activities, different input parameters in the grade estimation and mineral resource evaluation are always tainted with uncertainties. It is possible to investigate the uncertainties related to the measurements and parameters of the variogram model using the fuzzy kriging method instead of the kriging method. The fuzzy kriging theory has already bee...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2013