Travels Impacts of Bridge Closures 1: Lafayette Bridge Final Report

نویسندگان

  • Shanjiang Zhu
  • David Levinson
چکیده

This study evaluates traffic reactions to two alternative construction plans of Lafayette Bridge crossing the Mississippi River in downtown Saint Paul, Minnesota. We calibrate a travel demand model previously developed and evaluate network performance in different construction phases of the two alternative scenarios. Most significant changes in traffic condition occur during the bridge closure phase of scenario 2. The measurable impacts of bridge closure on traffic conditions are limited within the region of I-494 and US 61 to the east and I-35E to the west. The increases in freeway traffic are moderate. Most travelers choose to use the arterial bridges as alternative routes. The Robert Street Bridge and the Wabasha Street Bridge will see significant traffic increases. Overall changes in consumer surplus indicate that scenario 2 has a somewhat higher user cost ($5,209/day). However, the magnitude of difference in consumer surplus is very small and well within “margin of error”. The ultimate decision needs to consider construction cost savings due to faster construction, and safety issues in addition to changes in user cost.

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

I-35W Bridge Collapse: Travel Impacts and Adjustment Strategies

On August 1, 2007, the I-35W bridge crossing the Mississippi river collapsed. In addition to the human tragedy that it caused, the bridge failure also impacted how people moved. The bridge on average carried 140,000 vehicles daily and the failure required a significant amount of traffic find new routes to reach their destinations. In its aftermath travelers had to adjust their trips, requiring ...

متن کامل

Constriction Scour In Pressurized Flow Condition (RESEARCH NOTE)

When depth of flow past a river bridge exceeds opening under the bridge, the flow under the bridge becomes pressurized. The water is directed downward and under the bridge deck, causing increase in velocity and shear stress on the bed thereby increasing bed scour. This is termed as Pressure Flow Scour. The present study investigates the phenomenon of pressure flow scour resulting from a submerg...

متن کامل

Load Test and Model Calibration of a Horizontally Curved Steel Box-Girder Bridge

In this paper, full scale load test of a horizontally curved steel box-girder bridge is carried out in order to detect structural defects, which reportedly result in unwanted vibrations in nearby buildings. The bridge is tested under the passage of six heavy vehicles at different speeds, so as to determine its static and dynamic responses. A total number of one hundred and two (102) sensors are...

متن کامل

A Rare Case of Double Myocardial Bridges of the Left Anterior Descending Artery

Myocardial bridge is a benign congenital anomaly in which a segment of major epicardial coronary arteries descends into the myocardium for a variable distance. Myocardial bridge is most often single and located in the middle part of the left anterior descending artery. The presence of more than one myocardial bridge in coronary arteries is very rare. We present a patient with more than one myoc...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2010