This paper presents the optimal sequence of a set of jobs for a single machine with idle insert, in which the objective function is to minimize the sum of maximum earliness and tardiness (n/1/I/ETmax). Since this problem tries to minimize and diminish the values of earliness and tardiness, the results can be useful for different production systems such as just in time (JIT). Special case of determining the optimal sequence, considering common due date, is investigated and the structure of optimal solution is introduced, using some simple orders. In the general case, the neighborhood conditions are developed and the dominant set for any optimal solution is determined. The branch-and-bound (B&B) method is used to solve the problem, and the proper upper and lower bounds are also 0096-3003/$ see front matter 2005 Elsevier Inc. All rights reserved. doi:10.1016/j.amc.2005.05.011 * Corresponding author. E-mail addresses: [email protected] (R. Tavakkoli-Moghaddam), [email protected].
منابع مشابه
A Single Machine Sequencing Problem with Idle Insert: Simulated Annealing and Branch-and-Bound Methods
In this paper, a single machine sequencing problem is considered in order to find the sequence of jobs minimizing the sum of the maximum earliness and tardiness with idle times (n/1/I/ETmax). Due to the time complexity function, this sequencing problem belongs to a class of NP-hard ones. Thus, a special design of a simulated annealing (SA) method is applied to solve such a hard problem. To co...
متن کاملOptimal scheduling for a single machine to minimize the sum of maximum earliness and tardiness considering idle insert
This paper presents the optimal scheduling in a single machine by considering idle insert. The objective function is to minimize the sum of maximum earliness and tardiness. This scheduling problem can be applied in different production systems such as just in time (JIT) systems. Special case of common due date is presented and the associated optimal solution is reported. In general case of a si...
متن کاملSolving the Single Machine Problem with Quadratic Earliness and Tardiness Penalties
Nowadays, scheduling problems have a considerable application in production and service systems. In this paper, we consider the scheduling of n jobs on a single machine assuming no machine idleness, non-preemptive jobs and equal process times. In many of previous researches, because of the delivery dalays and holding costs, earliness and tardiness penalties emerge in the form of linear combin...
متن کاملAn improved memetic algorithm to minimize earliness–tardiness on a single batch processing machine
In this research, a single batch processing machine scheduling problem with minimization of total earliness and tardiness as the objective function is investigated.We first formulate the problem as a mixed integer linear programming model. Since the research problem is shown to be NP-hard, an improved memetic algorithmis proposed to efficiently solve the problem. To further enhance the memetic ...
متن کاملAn Optimum Algorithm for Single Machine with Early/Tardy Cost
The problem of determining the sequence of a set of jobs with the objective function of minimizing the maximum earliness and tardiness in one machine is studied. Production systems like JIT are one of the many applications of the problem. This problem is studied in special cases and their optimal solutions are introduced with simple orders. In general, some effective conditions for neig...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید
ثبت ناماگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید
ورودعنوان ژورنال:
- Applied Mathematics and Computation
دوره 174 شماره
صفحات -
تاریخ انتشار 2006