Development of New England Power Pool's Proposed Markets

نویسنده

  • Philip A. Fedora
چکیده

This paper summarizes the bidding procedures proposed by NEPOOL for the Energy, Reserve, Automatic Generation Control (AGC), and Operable Capability markets. Experience with the Installed Capability market is also described. On October 29, 1997 FERC accepted NEPOOL’s previous filings proposing the implementation of the Installed Capability Market by November 1, 1997, but suspended its implementation for five months. The NEPOOL Installed Capability Market became operational on April 1, 1998. On July 23, 1998, the 36th Amendment to the NEPOOL Agreement was filed by NEPOOL on to comply with the requirements of FERC’s April 20, 1998 Order. NEPOOL Participants have met throughout 1998 with ISO New England to define the proposed markets’ rules and bidding procedures. The bidding specifics are in the process of being finalized by the NEPOOL Regional Market Operations Committee. Subject to FERC approval, the target date for the proposed markets’ implementation is anticipated for December 1, 1998.

منابع مشابه

A New Approach for Accurate Pricing of Reactive Power and Its Application to Cost Allocation in Deregulated Electricity Markets

Reactive power management plays an essential role in the secure operation of the power system as an ancillary service. Although in electricity markets, the particular attention is paid to active power, the reactive power also plays an important on total generation costs of electricity. On the other hand, as it is mainly confined to local consumption, to avoid market power and maintain the se...

متن کامل

An Integrated Electric Power Supply Chain and Fuel Market Network Framework: Theoretical Modeling with Empirical Analysis for New England

Abstract: In this paper, we develop a novel electric power supply chain network model with fuel supply markets that captures both the economic network transactions in energy supply markets and the physical network transmission constraints in the electric power network. The theoretical derivation and analysis are done using the theory of variational inequalities. We then apply the model to a spe...

متن کامل

Morality and Values in Support of Universal Healthcare Must be Enshrined in Law; Comment on “Morality and Markets in the NHS”

This is a commentary on Gilbert and colleagues’ (1) paper on morality and markets in the National Health Service (NHS). Morality and values are not ephemeral qualities and universal healthcare is not simply an aspiration; it has to be enshrined in law. The creation of the UK NHS in 1948 was underpinned by core legal duties which required a system of public funding and delivery to follow. The mo...

متن کامل

طراحی الگوی چابکی در فرآیند توسعه محصول جدید با استفاده از مدل تحلیل مسیر در صنایع خودروسازی ایران

The new product development process has not been more challenging than it is today. Change in customers’ needs, pressure of global competition, and fragmentation of markets into smaller segments, rapid and never- ending changes in technological aspects and flexible production, force the NPD teams to introduce new products to their markets as rapidly as possible and reduce its cost with the high...

متن کامل

Probabilistic GENCOs Bidding Strategy in Restructured Two-Side Auction Power Markets

As a matter of course, power market uncertainties escalation is by product of power industry restructure on one hand and the unrivalled penetration of renewable energies on the other. Generally, the decision making process in such an uncertain environment faces with different risks. In addition, the performance of real power markets is very close to oligopoly markets, in which, some market play...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

متن کامل
عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 1999