Integrated Operations (Re-)Scheduling from Mine to Ship
نویسندگان
چکیده
Mining companies have complex supply chains that start from the mining location and stretch thousands of kilometers to the end customer in a different country and continent. The logistics of moving the materials from mines to ship is composed of series of optimization problems like berth allocation, ship scheduling, stockyard scheduling, and rail scheduling, which are individually NP-hard. In this paper, we present a scheduling application, called as IBM Optimization: Mine to Ship, for end-to-end integrated operations scheduling. The application is built on IBM ILOG ODM Enterprise with advanced features like rescheduling under deviations and disturbances, and maintenance scheduling. The modeling and computational complexity of integrated scheduling optimization is tamed using hybrid optimization technique that leverages mathematical programming and constraint programming. The application will benefit the mining companies with increased resource usage, higher throughput, reduced cost of operations, and higher revenue.
منابع مشابه
Optimisation of assembly scheduling in VCIM systems using genetic algorithm
Assembly plays an important role in any production system as it constitutes a significant portion of the lead time and cost of a product. Virtual computer-integrated manufacturing (VCIM) system is a modern production system being conceptually developed to extend the application of traditional computer-integrated manufacturing (CIM) system to global level. Assembly scheduling in VCIM systems is ...
متن کاملSolving Re-entrant No-wait Flexible Flowshop Scheduling Problem; Using the Bottleneck-based Heuristic and Genetic Algorithm
In this paper, we study the re-entrant no-wait flexible flowshop scheduling problem with makespan minimization objective and then consider two parallel machines for each stage. The main characteristic of a re-entrant environment is that at least one job is likely to visit certain stages more than once during the process. The no-wait property describes a situation in which every job has its own ...
متن کاملExact Mixed Integer Programming for Integrated Scheduling and Process Planning in Flexible Environment
This paper presented a mixed integer programming for integrated scheduling and process planning. The presented process plan included some orders with precedence relations similar to Multiple Traveling Salesman Problem (MTSP), which was categorized as an NP-hard problem. These types of problems are also called advanced planning because of simultaneously determining the appropriate sequence and m...
متن کاملORE extraction and blending optimization model in poly- metallic open PIT mines by chance constrained one-sided goal programming
Determination a sequence of extracting ore is one of the most important problems in mine annual production scheduling. Production scheduling affects mining performance especially in a poly-metallic open pit mine with considering the imposed operational and physical constraints mandated by high levels of reliability in relation to the obtained actual results. One of the important operational con...
متن کاملA Scheduling Model for the Re-entrant Manufacturing System and Its Optimization by NSGA-II
In this study, a two-objective mixed-integer linear programming model (MILP) for multi-product re-entrant flow shop scheduling problem has been designed. As a result, two objectives are considered. One of them is maximization of the production rate and the other is the minimization of processing time. The system has m stations and can process several products in a moment. The re-entrant flow sho...
متن کامل