Hybrid Metaheuristics for the Unrelated Parallel Machine Scheduling to Minimize Makespan and Maximum Just-in-Time Deviations

نویسندگان

  • Chiuh-Cheng Chyu
  • Wei-Shung Chang
چکیده

This paper studies the unrelated parallel machine scheduling problem with three minimization objectives – makespan, maximum earliness, and maximum tardiness (METUPMSP). The last two objectives combined are related to just-intime (JIT) performance of a solution. Three hybrid algorithms are presented to solve the MET-UPMSP: reactive GRASP with path relinking, dual-archived memetic algorithm (DAMA), and SPEA2. In order to improve the solution quality, min-max matching is included in the decoding scheme for each algorithm. An experiment is conducted to evaluate the performance of the three algorithms, using 100 (jobs) x 3 (machines) and 200 x 5 problem instances with three combinations of two due date factors – tight and range. The numerical results indicate that DAMA performs best and GRASP performs second for most problem instances in three performance metrics: HVR, GD, and Spread. The experimental results also show that incorporating min-max matching into decoding scheme significantly improves the solution quality for the two population-based algorithms. It is worth noting that the solutions produced by DAMA with matching decoding can be used as benchmark to evaluate the performance of other algorithms. Keywords-Greedy randomized adaptive search procedure; memetic algorithms; multi-objective combinatorial optimization; unrelated parallel machine scheduling; min-max matching

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Solving a New Multi-objective Unrelated Parallel Machines Scheduling Problem by Hybrid Teaching-learning Based Optimization

This paper considers a scheduling problem of a set of independent jobs on unrelated parallel machines (UPMs) that minimizesthe maximum completion time (i.e., makespan or ), maximum earliness ( ), and maximum tardiness ( ) simultaneously. Jobs have non-identical due dates, sequence-dependent setup times and machine-dependentprocessing times. A multi-objective mixed-integer linear programmi...

متن کامل

Heuristic approach to solve hybrid flow shop scheduling problem with unrelated parallel machines

In hybrid flow shop scheduling problem (HFS) with unrelated parallel machines, a set of n jobs are processed on k machines. A mixed integer linear programming (MILP) model for the HFS scheduling problems with unrelated parallel machines has been proposed to minimize the maximum completion time (makespan). Since the problem is shown to be NP-complete, it is necessary to use heuristic methods to ...

متن کامل

A bi-objective model for a scheduling problem of unrelated parallel batch processing machines with fuzzy parameters by two fuzzy multi-objective meta-heuristics

This paper considers a bi-objective model for a scheduling problem of unrelated parallel batch processing machines to minimize the makespan and maximum tardiness, simultaneously. Each job has a specific size and the data corresponding to its ready time, due date and processing time-dependent machine are uncertain and determined by trapezoidal fuzzy numbers. Each machine has a specific capacity,...

متن کامل

Flexible flowshop scheduling with equal number of unrelated parallel machines

This article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. The objective is to minimize the makespan for a given set of jobs in the system. This problem class is NP-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. A number of test problems are randomly ge...

متن کامل

Goal programming-based post-disaster decision making for allocation and scheduling the rescue units in natural disaster with time-window

Natural disasters, such as earthquakes, tsunamis, and hurricanes cause enormous harm during each year. To reduce casualties and economic losses in the response phase, rescue units must be allocated and scheduled efficiently, such that it is a key issues in emergency response. In this paper, a multi-objective mix integer nonlinear programming model (MOMINLP) is proposed to minimize sum of weight...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

ثبت نام

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

عنوان ژورنال:

دوره   شماره 

صفحات  -

تاریخ انتشار 2012