Solving Resource-Constrained Project Scheduling Problems with Time-Windows Using Iterative Improvement Algorithms
نویسندگان
چکیده
This paper proposes an iterative improvement approach for solving the Resource Constraint Project Scheduling Problem with Time-Windows (RCPSP/max), a well-known and challenging NP-hard scheduling problem. The algorithm is based on Iterative Flattening Search (IFS), an effective heuristic strategy for solving multi-capacity optimization scheduling problems. Given an initial solution, IFS iteratively performs two-steps: a relaxation-step, that randomly removes a subset of solution constraints and a solving-step, that incrementally recomputes a new solution. At the end, the best solution found is returned. The main contribution of this paper is the extension to RCPSP/max of the IFS optimization procedures developed for solving scheduling problems without time-windows. An experimental evaluation performed on medium-large size and web-available benchmark sets confirms the effectiveness of the proposed procedures. In particular, we have improved the average quality w.r.t. the current bests, while discovering three new optimal solutions, thus demonstrating the general efficacy of IFS.
منابع مشابه
A multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
متن کاملModeling and solving multi-skilled resource-constrained project scheduling problem with calendars in fuzzy condition
In this study, we aim to present a new model for the resource-constrained project scheduling problem (RCPSP) considering a working calendar for project members and determined the skill factor of any member using the efficiency concept. For this purpose, the recyclable resources are staff resources where any person with multiple skills can meet the required skills of activities in a given time. ...
متن کاملSplittable stochastic project scheduling with constrained renewable resource
This paper discusses the problem of allocation of constrained renewable resource to splittable activities of a single project. If the activities of stochastic projects can be split, these projects may be completed in shorter time when the available resource is constrained. It is assumed that the resource amount required to accom-plish each activity is a discrete quantity and deterministic. The ...
متن کاملResource Constrained Project Scheduling with Material Ordering: Two Hybridized Meta-Heuristic Approaches (TECHNICAL NOTE)
Resource constrained project scheduling problem (RCPSP) is mainly investigated with the objective of either minimizing project makespan or maximizing project net present value. However, when material planning plays a key role in a project, the existing models cannot help determining material ordering plans to minimize material costs. In this paper, the RCPSP incorporated with the material order...
متن کاملA Preemptive multimode resource constrained project scheduling model with cash flows
Resource constrained project scheduling problem is one of the most important issues in project planning and management. The objective function of this problem is to minimize the completion time of a project. When there is budget constraint or high risk for investment, using the criteria such as cash flows is so important. The development of computer systems and processors makes it possible to t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
عنوان ژورنال:
دوره شماره
صفحات -
تاریخ انتشار 2009