A new approach for automation of location-based earthwork scheduling in road construction projects
نویسنده
چکیده
a r t i c l e i n f o Accurate information of working locations is vital for efficient resource planning, safety of the construction site and monitoring the weekly progress of earthworks, which is missing in the existing linear scheduling methods. Construction managers have to depend on the subjective decisions for resources allocation and progress monitoring from location aspects. This has caused uncertainties in planning and scheduling, and consequently delays and cost overruns of projects. In this context, a prototype computer-based model was developed using the theory of the location-based planning. An arithmetic algorithm was designed by incorporating road design data, sectional quantities, variable productivity rates and haulage distance. This paper focuses on the improvement and demonstration of the model functions through a case study experiment, which include the automatic generation of location-based earthwork schedules and the optimisation of the weekly resource allocation when and where necessary from the location aspects, considering different options such as construction sequences of the cut/fill sections, site access points and the equipment sets with known productivity rates. The study concluded that the model is a decision supporting tool that assists in the resources planning, identifying time–space congestion, monitoring the activities progress on a weekly basis from the location aspects, and reducing the gap when communicating the scheduling information amongst the construction site teams. The construction industry has distinct characteristics in comparison with other industries in terms of one-off projects, site production, and temporary organisation [14]. The planning and scheduling process is a challenging task in the construction projects, and the decisions taken at the planning stage have the foremost impact on the successful execution of the project from its early conceptual stage to the completion stage [1]. Planning and scheduling include the precise allocation of the construction resources at the required locations and when necessary, particularly in the linear construction projects, such as roads and railways. Failure to allocate the critical resources of work activities at required locations has an adverse impact on the linear project performance such as cost, time, work-space conflicts and the safety of the workers at the construction site [16]. Arditi et al. [3] suggested that an earthwork project requires a separate planning task due to the distinctive characteristics of earthworks. The effective applications of planning and scheduling techniques: such as the Critical Path Method (CPM) and the Program Evaluation Review Technique (PERT) are limited, because the work …
منابع مشابه
An innovative approach for generation of a time location plan in road construction projects
Existing linear scheduling methods for earthwork activities lack accurate scheduling locations in road construction projects. Project planners and construction managers largely depend on subjective decisions for the allocation of resources at correct locations. This has caused uncertainties in planning and scheduling, and consequently delays and cost overruns of projects. Accurate information o...
متن کاملAutomatic Generation and Visualization of Location-based Scheduling
ABSTRACT: Accurate and visual information of working locations is vital for efficient resource planning and location-based scheduling of earthworks, which is missing in existing linear schedules. Thus, construction managers have to depend on subjective decisions for resources allocation and progress monitoring from location aspects. This has caused uncertainties in planning and scheduling, and ...
متن کاملA new developed model to determine waste dump site selection in open pit mines: An approach to minimize haul road construction cost
Today, during the life of an open pit mine, million tons of materials, including waste and ore, are displacing by truck fleets. In the case of a shallow ore deposit, which is located up to 300 meters to the ground surface, depending on preliminary equipment size and capacity, it will take three to five years to remove overburden and waste rocks to expose the ore body. In that period, the main w...
متن کاملAutomatic Generation of Progress Profiles for Earthwork Operations Using 4d Visualisation Model
Despite of the advances in construction planning and scheduling software, construction managers and planners are still facing problems in achieving accurate planning, scheduling and costing due to the one-off nature of the construction projects and the inherently uncertain site conditions and soil characteristics. The aim of the research presented in this paper is to introduce a new methodology...
متن کاملDEVELOPING THE LSM VPR SCHEDULING METHOD FOR SCHEDULING HIGHWAY CONSTRUCTION PROJECTS BASED ON EFFECTIVE FACTORS ON EMBANKMENT ACTIVITY PRODUCTIVITY
Highway construction projects are one of the most important construction projects in the world. Therefore predicting the time of these kinds of projects is important. Basically highway projects are including few activities which are repeating along the horizontal direction. One of the best methods for scheduling these types of projects is linear scheduling method. The repetitive nature of the h...