Sequencing Hybrid Two-stage Flowshop with Dedicated Machines
نویسندگان
چکیده
We treat the n-job, two-stage hybrid flowshop problem with one machine in the first stage and two different machines in parallel in the second stage. The objective is to minimize the makespan. We demonstrate that the problem is NP-complete. We formulate a dynamic program, which is beyond our grasp for problems of more than 15 jobs. We have conducted experimentation to evaluate the time performance the dynamic programming procedure for "small size" problems.
منابع مشابه
Flexible flowshop scheduling with equal number of unrelated parallel machines
This article addresses a multi-stage flowshop scheduling problem with equal number of unrelated parallel machines. The objective is to minimize the makespan for a given set of jobs in the system. This problem class is NP-hard in the strong sense, so a hybrid heuristic method for sequencing and then allocating operations of jobs to machines is developed. A number of test problems are randomly ge...
متن کاملAppling Metaheuristic Algorithms on a Two Stage Hybrid Flowshop Scheduling Problem with Serial Batching (RESEARCH NOTE)
In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is investigated. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among th...
متن کاملA Two-Stage Hybrid Flowshop Scheduling Problem with Serial Batching
In this paper the problem of serial batch scheduling in a two-stage hybrid flow shop environment with minimizing Makesapn is studied. In serial batching it is assumed that jobs in a batch are processed serially, and their completion time is defined to be equal to the finishing time of the last job in the batch. The analysis and implementation of the prohibited transference of jobs among the mac...
متن کاملSolving two-stage hybrid flow shop using climbing depth-bounded discrepancy search
This paper investigates how to adapt a discrepancy-based search method to solve two-stage hybrid flowshop scheduling problems in which each stage consists of several identical machines operating in parallel. The objective is to determine a schedule that minimizes the makespan. We present an adaptation of the Climbing Depth-bounded Discrepancy Search (CDDS) method based on Johnson’s rule and on ...
متن کاملMinimizing makespan in hybrid flowshops
We consider flowshop environments that consist of multiple stages and multiple machines in each stage. The flowshops are flexible in the sense that a task within a stage can be processed by any of the machines in the stage. We refer to this design as the hybrid flowshop. Our objective is to schedule a set of n jobs so as to minimize makespan. The problem is NP-complete even in the case of a sin...
متن کامل